My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1.b. PCSR 03-27-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2018
>
03-27-2018
>
6.1.b. PCSR 03-27-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:41:36 AM
Creation date
3/23/2018 10:41:00 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,t <br />ElkMemorandum <br />River <br />TO: Planning Department <br />From: Brandon Wisner, Stormwater Coordinator <br />Date: March 8, 2018 <br />Subject: Site Plan Review - February 2018 <br />The department listed above has reviewed the application listed below and has the following <br />comments: <br />Case #CU 18-05, Dennis Sharp — Sharp & Associates, 15585 Edison Street NW — <br />Edison Boat & RV Storage <br />1. Submit full SWPPP, HydroCAD and MIDS report. <br />2. Submit project description along with pre and post rate table. <br />3. Will the proposed `pond' basins be lined? <br />4. Has the groundwater elevation been determined? <br />5. Pre-treatment is required for infiltration basins, the two south basins treatment direction <br />may need to be switched. <br />6. Submit electronic plans, the current ones are difficult to read. <br />7. NPDES permit must be issued prior to construction starting. <br />Case #P 18-03, Royal Oaks Realty, Inc. —13707 185`'' Ave NW — Preliminary Plat, <br />Riverplace Second Addition <br />1. Have soil borings been done to determine the groundwater elevation? <br />2. Lake Orono is impaired for nutrients, provide all specific NPDES requirements. <br />3. Submit full SWPPP and MIDS report. <br />4. How will pond #1 hold water at elevation 876'? If so, will it be lined? <br />5. How will pond #1 overflow to infiltration area #1? <br />6. Show 100 year flood elevation on plan. <br />7. Rip rap is not allowed at culvert ends, articulated block is to be used in accordance with <br />city specifications. <br />8. Redundant sediment control is required upland of all water resources and infiltration <br />basins during active construction, update accordingly. <br />9. Show limit of disturbance line along the entire North side of the site adjacent to Lake <br />Orono. <br />10. Show proposed driveway slope percentage for each lot. <br />POWERED BV <br />A4ATUR <br />
The URL can be used to link to this page
Your browser does not support the video tag.