My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2. PCSR 03-27-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2018
>
03-27-2018
>
6.2. PCSR 03-27-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2018 10:28:30 AM
Creation date
3/23/2018 9:02:47 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. Show 0.1 -foot drop across all sanitary structures. <br />12. Include outside drop detail in final plans for San MH 3. <br />13. Adjust pipe directions on existing stormwater overflow pipe NW of the plat <br />14. Show all service locations on final plans. <br />15. No gate valves shown. Install per Elk River Municipal Utility direction. <br />16. Install pedestrian ramps at the trail crossing. <br />Stormwater <br />17. Provide soil borings verifying groundwater elevations. <br />18. Lake Orono is impaired for nutrients; please provide for all specific NPDES re@rements <br />related to impaired water bodies. <br />19. Submit full SWPPP and MIDS reports. <br />20. Please provide additional details related to pond #1 - How will it hold water at elevation 876 <br />feet? Will it be lined? How will pond #1 overflow to infiltration area #1? <br />21. Show 100 year flood elevation on plan. <br />22. Rip rap is not allowed at culvert ends, articulated block is to be used in accordance with city <br />specifications. <br />23. Redundant sediment control is re@red upland of all water resources and infiltration basins <br />during active construction, update accordingly. <br />24. Show limit of disturbance line along the entire North side of the site adjacent to Lake <br />Orono. <br />25. Include proposed driveway slope percentage for each lot. <br />Environmental <br />26. The proposed plans show the necessary setbacks for the stormwater pond and setbacks <br />from the lake, which are all within an easement. The majority of the individual parcels will be <br />within the Shoreland Management District which limits hardcover to 25% impervious <br />surface and limits intensive vegetation clearing. The preliminary plans will also be sent to our <br />DRN Area Hydrologist for his review. <br />The Planning Commission will review the preliminary plat on March 27, 2018, at 6:30 p.m. here at <br />city hall. With a recommendation on that date, the City Council will review the item on April 16, <br />2018, at 6:00 p.m. <br />If you have any questions I can be reached at 763.635.1035. Please address these comments on <br />future plans submitted to the city. <br />Sincerely, <br />Zack Carlton <br />Planning Manager <br />zcarlton@E1kRiverMN.gov <br />
The URL can be used to link to this page
Your browser does not support the video tag.