Laserfiche WebLink
<br />Great River Energy/CD 05-06 <br />March 21, 2005 <br /> <br />Page 2 <br /> <br />perimeter of the site and the use of straw rolls in the existing railroad ditch to control <br />sediment. <br /> <br />5. Storm drainage calculations have been submitted for the site and are currently being <br />reviewed. Along with the above-mentioned detention pond, the site does propose a rain <br />garden type of facility along the access road coming from Highway 10. <br /> <br />6. There will be some tree removal in the footprint of the building site, however, all of the <br />new landscaping will be around the perimeter of the Great River Energy property due to <br />the amount of underground fiber optic cable running between buildings on the site. <br /> <br />If you have any questions regarding any of these comments, please call. <br /> <br />Sincerely, <br /> <br />~p;rI~ <br /> <br />Terry J. Maurer, PE <br />City Engineer <br /> <br />S:\PLANNING\Case Files\200S\CU 05-06 Amcon GRE\03 15 05 Engineer's memo,doc <br />