My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 03-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
03-13-2018
>
5.3 ERMUSR 03-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2018 1:13:34 PM
Creation date
3/9/2018 1:13:33 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Analysis of Miles of Line and Interruptions <br /> Benchmarking metrics were created to help utilities explore the relationship between outages, overhead <br /> line exposure, and customer density. More specifically, by using interruptions per overhead mile of line <br /> and customers per mile utilities can benchmark reliability against system characteristics along with the <br /> customer normalized metrics included in the rest of the report. These system topography-related metrics <br /> can be helpful in understanding, for example, utility reliability against weather and animal-related outages <br /> relative to similarly dense and exposed utilities. <br /> Your utility's overhead miles of line as reported by Ventyx: 95 <br /> Table 14 <br /> Analysis of overhead miles of line and interruptions <br /> Interruptions per Mile Customers per Mile <br /> Your Utility: 0.3895 120.9368 <br /> Average for eReliability Tracker Utilities 0.9053 104.7849 <br /> Average for Utilities Within Your Region 0.8384 122.3345 <br /> 11 <br /> 214 <br />
The URL can be used to link to this page
Your browser does not support the video tag.