My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 03-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
03-13-2018
>
5.3 ERMUSR 03-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2018 1:13:34 PM
Creation date
3/9/2018 1:13:33 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
3/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2016 Energy Information Administration (EIA) Form 861 Data <br /> Form EIA-861 collects information on the status of electric power industry participants involved in the <br /> generation, transmission, distribution, and sale of electric energy in the United States, its territories, and <br /> Puerto Rico. <br /> EIA surveys electric power utilities annually through EIA Form 861 to collect electric industry data and <br /> subsequently make that data available to the public. In 2014, EIA began publishing reliability statistics in <br /> their survey from utility participants; therefore, the Association included EIA reliability statistics in this <br /> report for informational purposes. Please note that the following data includes investor-owned, rural <br /> cooperative, and public power utilities that were large enough to be required to fill out the full EIA 861, not <br /> the EIA 861-S form (for smaller entities). In addition, since the collection and release of EIA form data lags <br /> by more than a year, the data provided here is based on 2016 data only. Therefore, it is suggested that <br /> the aggregate statistics contained herein be used only as an informational tool for further comparison of <br /> reliability statistics. <br /> In the table, if an entity calculates SAIDI, SAIFI, and determines major event days in accordance with the <br /> IEEE 1366-2003 or IEEE 1366-2012 standard, they are included under the "IEEE Method" columns. If the <br /> entity calculates these values via another method, they are included under the "Other Method" columns. <br /> Additionally, it looks as though a number of utilities submitted incorrect data, which shows itself most in <br /> the average SAIFI numbers. For more general information on reliability metrics you can see the <br /> Association's website at http://publicpower.org/reliability. Although EIA collected other reliability-related <br /> data, the tables below only include SAIDI and SAIFI data. The full set of data can be downloaded at this <br /> link: http://www.eia.gov/electricity/data/eia861/ <br /> Table 12 <br /> Summary statistics of the SAIDI data compiled from 2016 data collected by EIA <br /> IEEE Method Other Method <br /> All No MEDs All No MEDs <br /> Average 314.2593 128.6160 210.6055 111.4045 <br /> Minimum Value 0.2840 0.0000 0.1740 0.1740 <br /> First Quartile (25th percentile) 81.7025 54.3800 31.4225 23.5100 <br /> Median Quartile (50th percentile) 154.8600 101.9000 97.0000 80.9000 <br /> Third Quartile(75th percentile) 292.7500 164.5150 205.1620 153.3400 <br /> Maximum Value 6957.4700 1099.0700 3163.4000 648.0000 <br /> Table 13 <br /> Summary statistics of the SAIFI data compiled from 2016 data collected by EIA <br /> IEEE Method Other Method <br /> All No MEDs All No MEDs <br /> Average 1.6569 1.2989 1.3222 1.0575 <br /> Minimum Value 0.0040 0.0000 0.0000 0.0000 <br /> First Quartile (25th percentile) 0.8800 0.6700 0.4740 0.3900 <br /> Median Quartile (50th percentile) 1.3400 1.0700 1.0540 0.9300 <br /> Third Quartile(75th percentile) 2.0600 1.5600 1.7920 1.4400 <br /> Maximum Value 29.0000 28.0200 13.0000 5.8800 <br /> 10 <br /> 213 <br />
The URL can be used to link to this page
Your browser does not support the video tag.