Laserfiche WebLink
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> Source-Area EPS <br /> AREA EPS <br /> 11! METERING(SEE TABLE 5A) <br /> LOCAL EPS 0 SERVICE ENTRANCE EQUIPMENT <br /> (ACCESSIBLE,VISIBLE&LOCKABLE <br /> .. DISCONNECT DEVICE) <br /> i pie <br /> . <br /> E--- 1 <br /> ACCESSIBLE.VISIBLE& <br /> TRANSFER SWITCH QUICK OPEN OR AMICABLE DISCONNECT DEVICE <br /> LOAD CLOSED TRANSITION-'MAKE BEFORE BREAK' •(OPTIONAL BUT RECOMMENDED) <br /> 0.5 SEC.MAX PARALLEL TIME <br /> CT(3) 50451GI <br /> (3) <br /> ...0.2100No, Trios <br /> 25 <br /> synchronizer <br /> BREAKER 71`MAY SERVE AS <br /> ACCESSIBLE DISCONNECT A <br /> 25SC 'Synch-check Relay DEVICE IF DRAWOUT <br /> 50!51 Phase Overcurrent 861A el\ <br /> 51N Ground Overcurrent 3-PHASE Tripped by <br /> GENERATOR 6L <br /> 62PL 'ParaUei Limit Timer 861A <br /> 86 'Lockout Relay A <br /> QUICK OPEN OR <br /> CLOSED TRANSITION <br /> (1)(2)(3) Indicates Nunes of Phases to be Monitored "MAKE-BEFORE-BREAK" <br /> 'Indicates Minimum Requried Protection DATE: <br /> Other Relays Shown are Recommended for Generator Protection. JAN 2003 Figure 2 <br /> Interconnection Process for Distributed Generatier Systems <br />