My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> Source-Area EPS <br /> /\/'\/\!\ <br /> aMETERING(SEE TABLE 5A) <br /> AREA EPS <br /> LOCAL EPS SERVICE ENTRANCE EQUIPMENT <br /> (ACCESSIBLE,VISIBLE&LOCKABLE <br /> DISCONNECT DEVICE) <br /> OPTIONAL,BUT RECOMMENDED <br /> 1 TRANSFER SWITCH <br /> -BREAK-BEFORE-MAKE <br /> I -MECHANICALLY INTERLOCKED <br /> LOAD <br /> ACCESSIBLE.VISIBLE& <br /> O-- <br /> 7LOCKABLE DISCONNECT DEVICE <br /> (OPTIONAL BUT RECOMMENDED) <br /> 1-PHASE OR <br /> 3-PHASE <br /> GENERATOR <br /> NOTE: BREAK-BEFORE-MAKE <br /> AUTOMATIC TRANSFER <br /> SWITCHES SHALL BE <br /> MECHANICALLY INTERLOCKED <br /> OPEN TRANSITION <br /> "BREAK-BEFORE-MAKE" <br /> DATE: Figure 1 <br /> JAN 2003 g <br /> Interconnection Process for Distributed Generatter2Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.