Laserfiche WebLink
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> Source-Area EPS <br /> /\/'\/\!\ <br /> aMETERING(SEE TABLE 5A) <br /> AREA EPS <br /> LOCAL EPS SERVICE ENTRANCE EQUIPMENT <br /> (ACCESSIBLE,VISIBLE&LOCKABLE <br /> DISCONNECT DEVICE) <br /> OPTIONAL,BUT RECOMMENDED <br /> 1 TRANSFER SWITCH <br /> -BREAK-BEFORE-MAKE <br /> I -MECHANICALLY INTERLOCKED <br /> LOAD <br /> ACCESSIBLE.VISIBLE& <br /> O-- <br /> 7LOCKABLE DISCONNECT DEVICE <br /> (OPTIONAL BUT RECOMMENDED) <br /> 1-PHASE OR <br /> 3-PHASE <br /> GENERATOR <br /> NOTE: BREAK-BEFORE-MAKE <br /> AUTOMATIC TRANSFER <br /> SWITCHES SHALL BE <br /> MECHANICALLY INTERLOCKED <br /> OPEN TRANSITION <br /> "BREAK-BEFORE-MAKE" <br /> DATE: Figure 1 <br /> JAN 2003 g <br /> Interconnection Process for Distributed Generatter2Systems <br />