My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> (2) Phase voltage representative of the Area EPS's service to the facility. <br /> (3)Status(open/close)of Distributed Generation and interconnection breaker(s)or if transfer switch <br /> is used,status of transferswitch(s). <br /> (4) Customer load from Area EPS service(kW and kVAR). <br /> (5) Control of interconnection breaker-if required by the Area EPS operator. <br /> When telemetry is required, the Interconnection Customer must provide the communications <br /> medium to the Area EPS's Control Center. This could be radio, dedicated phone circuit or <br /> other form of communication. If a telephone circuit is used, the Interconnection Customer <br /> must also provide the telephone circuit protection. The Interconnection Customer shall <br /> coordinate the RTU (remote terminal unit) addition with the Area EPS. The Area EPS may <br /> require a specific RTU and/or protocol to match their SCADA or remote monitoring system. <br /> Interconnection Process for Distributed GeneratiSystems <br />
The URL can be used to link to this page
Your browser does not support the video tag.