Laserfiche WebLink
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> (2) Phase voltage representative of the Area EPS's service to the facility. <br /> (3)Status(open/close)of Distributed Generation and interconnection breaker(s)or if transfer switch <br /> is used,status of transferswitch(s). <br /> (4) Customer load from Area EPS service(kW and kVAR). <br /> (5) Control of interconnection breaker-if required by the Area EPS operator. <br /> When telemetry is required, the Interconnection Customer must provide the communications <br /> medium to the Area EPS's Control Center. This could be radio, dedicated phone circuit or <br /> other form of communication. If a telephone circuit is used, the Interconnection Customer <br /> must also provide the telephone circuit protection. The Interconnection Customer shall <br /> coordinate the RTU (remote terminal unit) addition with the Area EPS. The Area EPS may <br /> require a specific RTU and/or protocol to match their SCADA or remote monitoring system. <br /> Interconnection Process for Distributed GeneratiSystems <br />