My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1 ERMUSR 02-13-2018
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2018
>
02-13-2018
>
4.1 ERMUSR 02-13-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2018 3:08:51 PM
Creation date
2/9/2018 3:08:45 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
2/13/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 3—INTERCONNECTION PROCESS,TECHNICAL REQUIREMENTS,AND OPERATING PROCEDURES <br /> Final acceptance testing will commence when all equipment has been installed, all contractor <br /> preliminary testing has been accomplished and all Area EPS preliminary testing of the monitoring <br /> and dedicated equipment is completed. One to three weeks prior to the start of the acceptance <br /> testing of the generation iriterconnection the Applicant shall provide, a report stating: <br /> 1. That the Generation System meets all interconnection requirements. <br /> 2. All contractor preliminary testing has been completed. <br /> 3. The protective systems are functionally tested and ready. <br /> 4. A proposed date that the Generation System will be is ready to be energized <br /> and acceptance tested. <br /> For non-type certified systems a Professional Electrical Engineer registered in the State of <br /> Minnesota is required to provide this formal report. <br /> For smaller systems scheduling of this testing may be more flexible, as less testing time is <br /> required than for larger systems. <br /> In many cases, this testing is done after hours to ensure no typical business-hour load is <br /> disturbed. If acceptance testing occurs after hours, the Area EPS Operator's labor will be billed <br /> at overtime wages. During this testing, the Area EPS Operator will typically run three different <br /> tests. These tests can differ depending on which type of communication/monitoring system(s) <br /> the Area EPS Operator decides to install at the site. <br /> For, problems created by Area EPS or any Area EPS equipment that arise during testing, the <br /> Area EPS will fix the problem as soon as reasonably possible. If problems arise during testing <br /> which are caused by the Applicant or Applicant's vendor or any vendor supplied or installed <br /> equipment, the Area EPS will leave the project until the problem is resolved. Having the testing <br /> resume will then be subject to Area EPS personnel time and availability. <br /> Step 10 (By Area EPS) <br /> After all Area EPS Operator's acceptance testing has been accomplished and all requirements <br /> are met, the Area EPS Operator shall provide written approval for normal operation of the <br /> Generation System interconnection, within 3 business days of successful completion of the <br /> acceptance tests. <br /> Step 11 (By Applicant) <br /> Within two (2) months of interconnection, the Applicant shall provide the Area EPS with updated <br /> drawings and prints showing the Generation System as it was when approved for normal <br /> operation by the Area EPS Operator. The drawings shall also include all changes which were <br /> made during construction and the testing process. <br /> Attachments: <br /> Attached are several documents which may be required for the interconnection process. They <br /> are as follows; <br /> Appendix A: <br /> Flow chart showing summary of the interconnection process. <br /> Appendix B: <br /> Generation Interconnection Application Form. <br /> Interconnection Process for Distributed Generatiyg Systems <br />
The URL can be used to link to this page
Your browser does not support the video tag.