Laserfiche WebLink
Capital Improvement Plan 2018 fhrw 2022 <br />Department InfrasWcture Improvements <br />City of Elk River, Minnesota <br />Contact Engineer <br />Type Improvement <br />Project N PM -01 Useful Lite 25 years <br />Project Name Pavement Management Program <br />Category Street & Utility Construction <br />Description <br />'reventative maintenance on our streets includes sealcoating, crackfilling and small overlay projects. <br />>treet improvement projects to replace, overlay or rehabilitate aged and deteriorated streets, storm drainage, and adjacent walks will be completed <br />:very other year. <br />Justification <br />street pavement conditions will dictate what pavement management technique will be utilized to extend the life of that specific street <br />These techniques may range from preventative maintenance to a full reconstruction of the surface and aggregate base. As they are <br />led, the prescribed techniques will continually be gauged to assure their performance is proper in extending the life of our pavements. <br />Expenditures <br />2018 2019 2020 2021 2022 Total <br />Construction <br />4,500,000 5,250,000 9,750,000 <br />Preliminary Design <br />100,000 100,000 100,000 300,000 <br />Preventative Maintenance <br />200,000 200,000 200,000 200,000 200,000 1,000,000 <br />Total 300,000 4,700,000 300,000 5,450,000 300,000 11,050,000 <br />Funding Sources 2018 2019 2020 2021 2022 Total <br />Municipal State Aid 353,500 1,357,000 360,500 1,364,000 367,500 3,802,500 <br />Pavement Management Fund 3,193,000 3,936,000 7,129,000 <br />Storm Water 150,000 150,000 300,000 <br />Total 353,500 4,700,000 360,500 5,450,000 367,500 11,231,500 <br />2018-2022 CAPITAL IMPROVEMENT PLAN <br />