<br />Special Worksession of the Elk River City Council <br />January 8, 1994 <br /> <br />Page 4 <br /> <br />e <br /> <br />Street drainage area, and utilizes the County ditch system. The total project is <br />estimated at $400,000. <br /> <br />The City Engineer and the City Council reviewed the culverts underneath the <br />highway and railroad crossing that is associated with this drainage district. The <br />railroad crossing has a 36 inch culvert and this limits the amount of water and the <br />rate that water can flow toward the highway culvert, and, ultimately, into the <br />river. The Council discussed the County ditch system and the need to work with <br />developers in the County to improve this system. <br /> <br />The City Engineer reviewed with the City Council some of the options on the utility <br />fee system. It was indicated that everyone in the urban area should pay some <br />fee for storm drainage regardless of its development status. It was also noted <br />that gravel mines and areas north of County Road 33 contribute very little storm <br />drainage water and that these areas may not be required to pay the utility fee. <br /> <br />Councilmember Farber left at this time (9:55 p.m.) <br /> <br />e <br /> <br />After further discussion, it was the consensus of the City Council that the City <br />Engineer should take the next steps in the process to implement the Deerfield III <br />and Schulz/Deschenes area drainage projects. The next step in the Deerfield III <br />area would be to negotiate the easement with Mr. and Mrs. Hartman and <br />present the bids for this project to the City Council for its consideration after the <br />funding for the project is analyzed. The next step in the Schulz/Deschenes area <br />project is to put together the easements necessary for the project and to have <br />the City and the property owners enter into an agreement for the construction of <br />this project. <br /> <br />Regarding the Main and Evans project, the City Engineer reviewed the two <br />different drainage options for this project. Both drainage options add water to <br />the County ditch system. Either drainage option will cost a minimum of $175,000. <br />The Elk Park Center development project will have some effect on the storm <br />water problems in this area and the problems will increase unless an improvement <br />project takes place. This project takes about 120 days to complete. The <br />preferred option at this time is to install a pipe along Main Street toward the <br />County ditch that currently exists near the southwest corner of the Main Street <br />and Highway 169 intersection. The Council agreed to put this project on hold for <br />at least thirty to sixty days. <br /> <br />The Council directed staff to evaluate the option of simply having a tax levy <br />approved by the City in order to raise funds for storm drainage projects. Some <br />Councilmembers questioned whether or not this City-wide tax levy would be <br />equitable and fair. The Council directed staff to put this issue on the 1/18/94 City <br />Council agenda in order for the City Council to consider a motion that would <br />request the Municipal Utilities assistance in implementing a storm drainage utility <br />billing system. <br /> <br />4. <br /> <br />Transportation Plan <br /> <br />e <br /> <br />The City Engineer reviewed the 3/93 preliminary transportation plan with the City <br />Council. It was indicated that the City Council had three areas of concern with <br />this preliminary plan and these three areas were labeled as areas C, D and E. The <br />