My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-08-1994 CC MIN - SPECIAL
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
1990-1999
>
1994
>
01-08-1994 CC MIN - SPECIAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:30 AM
Creation date
3/14/2005 2:06:12 PM
Metadata
Fields
Template:
City Government
type
CCM
date
1/8/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Special Worksession ofthe Elk River City Council <br />January 8, 1994 <br /> <br />Page 2 <br /> <br />e <br /> <br />The City Engineer distributed a wastewater treatment plant expansion timetable <br />and cost estimate. It was noted that once MPCA approves the plans and <br />specifications, the project can be completed within twenty months and ready for <br />operation with increased capacity. At this time the earliest plans could be <br />approved and ready for bidding would be in the spring of 1995. On a parrallel <br />timetable is the expansion of utility pipes into the East Highway 10 area. The City <br />Engineer noted that it takes approximately twenty months from the ordering of a <br />public hearing for the project to completion of the installation of the pipes so that <br />properties can hook up to the system. A determining factor in ordering the plant <br />expansion and ordering the public hearing for the installation of utilities in the East <br />Highway 10 corridor will be the available finances for the plant expansion. <br /> <br />The Finance Director distributed a three page summary of wastewater treatment <br />plant projected revenues and expenditures in order to help analyze when the <br />City can afford a plant expansion. The Finance Director indicated that the <br />projections for revenues were conservative and would change dramatically if <br />higher than anticipated growth takes place. The projections provide an estimate <br />of the amount available for debt service based on estimated growth factors. The <br />amount available figures on Page 1 exclude depreciation. After the plant is <br />expanded, these funds will need to be accumulated for the 2008 expansion; but <br />prior to the expansion project currently discussed, the depreciation expense can <br />be added to the total available in order to help service a portion of the bonded <br />debt. At this time it appears that the City witl have about $215,000 in 1996 for <br />debt payment and that this will increase to about $270,000 by 1999. <br /> <br />e <br /> <br />The Finance Director continued reviewing her handout and on Page 2 and Page <br />3 reviewed the amount available in 1994 for future projects as compared to the <br />cost of the plant expansion. It was noted that if the project is not authorized until <br />late 1996 or early 1997, then the City will have cash to buy down the bond issue to <br />about $4.5 million. This can be financed over thirty years with a bond payment of <br />approximately $345,000. At this time it appears the City will be short of that <br />amount being available on an annual basis to meet the debt obligation. <br />However, if growth exceeds projections and if less money is put away for the 2008 <br />plant expansion, then it may be possible for the City to cash flow this debt around <br />this timetable. <br /> <br />It was noted that the timetable indicated by the Finance Director would allow for <br />the plant to be expanded and in operation by 1998 which coincides with the <br />plant capacity figures previously indicated by the City Engineer. Additionally, it is <br />conceivable that this timetable can be moved up if higher than expected <br />growth takes place. This will be closely monitored by the City staff. <br /> <br />e <br /> <br />Mayor Duitsman stated his desire to plan for the plant expansion and the <br />extension of utilities to East Highway 10 for 1996 so that hook-ups can begin in <br />1997. The Finance Director indicated that the figures displayed in the handout <br />are slightly conservative and that the Mayor's goal may be obtainable, but this <br />will not be known until some time in 1995. The Finance Director indicated that a <br />rate increase should be considered by the City Council if the plant is to be <br />expanded in 1996 due to the need for funding the plant expansion and based on <br />the ongoing operating expenses of the utility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.