Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />.} <br /> <br />BID SCHEDULE FOR: BITUMINOUS TRAIL SECTION <br />CITY OF ELK RIVER, MINNESOTA <br /> <br /> <br /> SCHEDULE 1.0 . TRAIL <br />1 COMMON EXCAVATION CY 23 $15.00 $345.00 <br />2 TYPE 41 WEA 50055Y BITUMINOUS TON 13 $30.00 $390.00 <br />3 AGGREGATE BASE, CLASS 5 TON 30 $12.00 $360.00 <br />4 SEEDING ACRE 0.02 $1,000.00 $20.00 <br />5 SEED MIXTURE 50A LB 1 $19.00 $19.00 <br />6 COMMERCIAL FERTILIZER ANALYSIS 6-24-24 LB 4 $4.75 $19.00 <br />7 MULCH, TYPE 1 TON 0.04 $500.00 $20.00 <br />8 WOOD FIBER BLANKET SY 90 $1.50 $135.00 <br />T SCHEDULE 1.0. COUNTY ROAD 1 SIDEWALK. TOTAL $1,308.00 <br /> 5% CONTINGENCIES $65.40 <br /> <br />BID SUMMARY. TOTAL <br /> <br />$1,373.40 <br /> <br />THIS ESTIMATE IS FOR A TRAIL 100' LONG X 10' WIDE. COST PER LINEAR FOOT <br />OF TRAIL IS $13.75\;: <br /> <br />COMMON EXCAVATION (12' WIDE) <br />TYPE 41 WEA 50055Y BITUMINOUS (10' WIDE) <br />AGGREGATE BASE, CLASS 5 (12'WIDE) <br />SEEDING <br />SEED MIXTURE 50A <br />COMMERCIAL FERTILIZER ANALYSIS 6-24-24 <br />MULCH, TYPE 1 <br />WOOD FIBER BLANKET <br /> <br />llrail-est.x1s <br /> <br />(100 X 12 X 6/12)/27 <br />(100 X 10 X 2/12)/27 X 1.98 <br />(100X 12 X 4/12)127 X 1.86 <br />(2 SIDES X 4 X 100)/43560 <br />0.2 ACRES X 50 LBS/ACRE <br />0.2 ACRES X 200 LBS/ACRE <br />0.2 ACRES X 2 TONS <br />(2 SIDES X 4 X 100)/9 <br /> <br />4A <br />