Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Trail specification discussion <br /> <br />Terry Maurer, Phil Hals, Stephen Wensman, Dave Anderson <br /> <br />Preconstruction meeting discussing performance expectations <br />. Surface voids <br />. Smoothness <br /> <br />Revise standard specification with: <br />· An additional cross section showing curb cut <br />· Specifying type of mix with smaller rock <br />. Smoothness tolerance of 1/8" per 10' of trail <br />. Finish grading with topsoil, seed, and fertilizer, or wood fiber <br />blanket if on steep slopes. <br /> <br />Trail reimbursement discussion <br />Determine costs of required trails for discussion <br />