Laserfiche WebLink
<br />Estimate Operating'and Maintenance Costs <br /> <br />. <br /> <br />The annual operations and maintenance (O&M) costs will be estimated consistent with work being <br />completed for the Northstar Corridor Commuter Rail Study. The estimation of operating and <br />maintenance costs for the extension study will be completed for a TSM Alternative and the Commuter <br />Rail alternative and its feeder bus alternative. The BRW Team will develop resource build-up cost <br />models consistent with Ff A guidelines for commuter rail and bus models. <br /> <br />Operating costs will be estimated both before and after fare revenues are deducted. Fare policies and <br />assumptions will be consistent with and based on core Northstar Corridor work. <br /> <br />Bus O&M Cost Model <br /> <br />The bus O&M cost model developed to estimate costs of feeder bus service in the study corridor will be <br />used for the extension study. The bus operating and maintenance cost model for the extension study will <br />be completed for a TSM Alternative and for the Commuter Rail alternative and its feeder bus <br />components. The bus O&M cost model will be based on current expenses and operations. <br /> <br />Commuter Rail O&M Cost Model <br /> <br />The same methodology and assumptions being used for this task in the Northstar Corridor Commuter <br />Rail Study will be used for the extension study to Camp Ripley. The commuter rail model will be <br />adapted for the study area using local wage rates and fringe benefits, non-labor unit costs, and <br />assumptions regarding the administration and operation of the rail system. <br /> <br />. Subtask 2-D Detailed Ridership Forecasting <br /> <br />The same methodology used for this task in the Northstar Corridor Phase I MIS and Commuter Rail <br />Feasibility Study will be used for the extension study to Camp Ripley. <br /> <br />The ridership forecasting model will be expanded to include the area north of downtown Rice to Camp <br />Ripley. The forecasting process will take into account an understanding of the characteristics of existing <br />travel in the corridor. The same forecast years will be developed and analyzed as were developed in the <br />Northstar Corridor Phase I MIS and Commuter Rail Feasibility Study. <br /> <br />The following work tasks will be completed: <br /> <br />> Modification of the zone system outside of the Twin Cities and St. Cloud metropolitan areas to add <br />sufficient detail around proposed additional stations. <br />> Reevaluating work trip in new zones based on census journey to work data as done in the original <br />Northstar commuter rail work. <br />> Adding detail to the highway network and transit network around potential new stations. <br />> Rerunning models as completed during the Phase I Northstar commuter rail work. <br />> Addressing potential rail trips around new stations without the use of a model but using the <br />consultant's "best judgment". <br />> Preparing a summary of results. <br /> <br />Preliminary results will be reviewed with Morrison County and Northstar Corridor staff. Modifications <br />. based on these reviews will be incorporated before completing this task. <br /> <br />Exhibit A - Revised Work Plan for the Extension of the Northstar <br />Corridor Commuter Rail North of the City of Rice to Camp Ripley <br /> <br />5 <br />September 16. 1999 <br />