Laserfiche WebLink
OIIN ST III UCTi 11011'4 <br /> PRELIMINARY ESTIMATE SUMMARY <br /> ESTIMATE DATE: April 12, 2017 <br /> PROJECT: Elk River Ice Arena <br /> ARCHITECT: 292 Design Group <br /> DRAWING DATE: March 27, 2017 <br /> Base $/sf <br /> DESCRIPTION Notes Estimate 125,606 <br /> Construction Costs <br /> Selective Demolition Interior Demo at Existing Rink $315,240 $2.51 <br /> Concrete $646,727 $5.15 <br /> Precast Concrete $2,306,118 $18.36 <br /> Masonry $838,049 $6.67 <br /> Structural Steel $712,184 $5.67 <br /> Metal Fabrications $142,884 $1.14 <br /> Rough Carpentry $67,751 $0.54 <br /> Millwork $118,830 $0.95 <br /> Roofing $622,440 $4.96 <br /> Waterproofing At Elevator Pit Only $3,000 $0.02 <br /> Joint Sealants $18,343 $0.15 <br /> Doors Frames Hardware $110,281 $0.88 <br /> Glass&Glazing $268,150 $2.13 <br /> Finishes $847,803 $6.75 <br /> Specialties $19,884 $0.16 <br /> Aluminum Benches Locker Room &Stadia Benches $102,800 $0.82 <br /> Aluminum Bleacher Relocation $30,000 $0.24 <br /> Site Furnishings $3,500 $0.03 <br /> Ice Rink System $3,020,000 $24.04 <br /> Elevators $75,000 $0.60 <br /> Fire Protection $196,951 $1.57 <br /> Plumbing $747,804 $5.95 <br /> HVAC $1,353,964 $10.78 <br /> Electrical $1,561,632 $12.43 <br /> Earthwork Includes Barn demo. $428,470 $3.41 <br /> Site Paving $5,250 $0.04 <br /> Site Concrete $20,481 $0.16 <br /> Site Utilities Allowance $75,000 $0.60 <br /> Landscaping $16,058 $0.13 <br /> Survey $32,372 $0.26 <br /> General Conditions&Reimbursable Ex enses $624,213 $4.97 <br /> Temp Heat&Barriers $117,952 $0.94 <br /> Daily&Final Clean $57,267 $0.46 <br /> General Liability Insurance $155,064 $1.23 <br /> Builders Risk Insurance $37,215 $0.30 <br /> 113uilding Permit 1 $180,181 1 $1.43 <br /> Bond 1 1 $113,405 1 $0.90 <br />