Laserfiche WebLink
<br />. <br /> <br />Mr. Scott Harlicker <br />September 15, 1999 <br />Page Four <br /> <br />. No details were submitted to show how the outlet structures for ponds 1 and 2 will be <br />constructed and operated. These details need to be submitted with the final construction <br />plans. These outlets need to be the type that will trap floating debris. <br /> <br />. The identification of the ordinary high water mark will have an impact on NURP pond <br />number 2. The pond will need to moved to the north to stay above and out of the ordinary <br />high water elevation. <br /> <br />. 1 DO-year high water elevations should be shown for the proposed ponds. The top of the <br />berm should provide for a minimum of 1-foot of free board above the 1 DO-year high water <br />level. <br /> <br />If you have any questions or would like more detail on any of these comments please call. <br /> <br />Sincerely, <br /> <br />Howard R. Green Company <br /> <br />. ,~p;;~ <br /> <br />Terry J. ~~urer, P.E. <br /> <br />. <br /> <br />O:\PROJ\807640'\0240\640-1501.StJ9JCiard R. Green Company <br />J P CONSULTING ENGINEERS <br />