My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1. SR 09-05-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
09-05-2017
>
10.1. SR 09-05-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2017 11:07:22 AM
Creation date
8/30/2017 4:19:06 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Fire Department <br />Elk River, MN <br />Fire Station Feasibility and Facilities Study <br /> <br />Five Bugles Design <br />A Division of Wendel Companies <br /> <br />Station No. 2 <br />13073 Orono Parkway NW <br /> <br />PHYSICAL CONDITION <br />Building Envelope: Station No. 2 shares space in the Public Safety Building with the Elk River Police <br />Department. It appears to be well constructed of load bearing masonry construction with metal bar joist <br />and metal deck roof structure. It was constructed in 2003 and is well within its operating life, though <br />some systems may be expected to need replacement in the coming years. <br />Exterior doors and windows are in good, operable condition with aluminum windows with insulated <br />glazing. <br />The roof is original to its construction and within its operational limits. <br />Mechanical and Electrical Systems: The HVAC system is a Geothermal heat exchange system with a <br />variety of heat pumps providing point of service control. This system seems to be operating well all <br />though there are some reports of failing heat pumps in random areas of the building; which should be <br />considered normal for the life of these systems. The building is sprinklered. <br />No concerns have been reported with the heating or electrical systems beyond normal maintenance. <br />OPERATIONS <br />Station No. 2 operates as the department’s headquarters station. Changes made in recent years have <br />reorganized the administrative offices to better function for that role. Otherwise the facility functions <br />87
The URL can be used to link to this page
Your browser does not support the video tag.