My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1. SR 09-05-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
09-05-2017
>
10.1. SR 09-05-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2017 11:07:22 AM
Creation date
8/30/2017 4:19:06 PM
Metadata
Fields
Template:
City Government
type
SR
date
9/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River Fire Department <br />Elk River, MN <br />Fire Station Feasibility and Facilities Study <br /> <br /> <br />Five Bugles Design <br />A Division of Wendel Companies <br />Probable Cost for expansions and renovations at the Police Department are developed using square foot <br />costs. Low and high ranges are established due to the early nature of the project. The range is established <br />using costs from Engineering New Record (a national construction cost source) and Five Bugles Designs <br />historical cost data base. It should be assumed that the final construction cost will fall between the low <br />and high range. <br /> <br /> Low Range High Range <br />Cost of Construction $2,334,675 $2,690435 <br />Other Costs (FF&E, Technology, <br />Contingencies, Fees and Legal) <br />$685,259 $896,941 <br /> <br /> <br />Total $3,019,934 $3,587,376 <br /> <br />11
The URL can be used to link to this page
Your browser does not support the video tag.