My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1. SR 08-21-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
08-21-2017
>
8.1. SR 08-21-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2017 4:21:20 PM
Creation date
8/17/2017 4:10:52 PM
Metadata
Fields
Template:
City Government
type
SR
date
8/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hoisington Koegler Group Inc. <br />Hoisington Koegler Group Inc. <br />123 North Third Street, Suite 100 <br />Minneapolis, Minnesota 55401 <br />(612) 338-0800 Fax (612) 338-6838 www.hkgi.com <br />1 of 1 <br /> <br />Creating Places that Enrich People’s Lives <br /> <br />Dug Out Pricing Summary <br />Project: YAC and Oak Knoll Dugouts 2017 fall Improvements <br />Date: May 8, 2017 <br /> <br />HKGI solicited Quotes from numerous contractors to prepare dugout concrete slabs, assembly dug out roof kits <br />(supplied by City) and chain link fencing at the fields of YAC and Oak Knoll Parks in the fall of 2017. <br />Optional work included a short CMU wall and fencing at the 4 YAC fields. <br /> <br />A summary of the received quotes are as follows: <br />Three general contractors submitted pricing for the complete base quote at $161,760.00, $119,438.16 and <br />$116,960.00. Two contractors priced the optional CMU walls at YAC for $34,803.76 and $24,768.00. One <br />contractor submitted just fence pricing at $19,800 for 8 dugouts, and a crew from Florida is willing to assemble <br />the dugout kits for $29,120.00 with option of including dugout kit ftgs for $6,040.00 . <br /> <br />Flagship Recreation, Inc. submitted a low quote for assembling the dugout kits and fencing – but no concrete <br />work. They assumed City would pull the approx. existing 28 fence posts and they would re-use salvaged fencing <br />for parts. <br /> <br />M.A.C. Masonry, Inc. of Elk River submitted a low price for the concrete slab work and CMU optional work. <br />Their bid for additional CMU work assumed stock materials, there is a $500 set up charge for custom colors. <br /> <br />We suggest combining the two contractors (Flagship and M.A.C. Masonry work the base project comes in at $ <br />68,899.20 for 8 dugouts, and $18,913.44 to add the CMU wall option to the 4 dugouts at YAC. <br />This work assumes the City would take care of any necessary erosion control, removals/disposals, and area <br />restoration. <br />The dug out kits quote from Dugout USA is $46,150 for 8 dugouts kits delivered. <br /> <br />In summary, the total cost per dugout comes in at $14,381.15 each for the 8 dugouts, with an addition of <br />$4,728.36 each to add a CMU wall at the 4 YAC fields. <br /> <br />The City will need to order the dugout kits this month in order to receive them within the 5-6 week lead time <br />suggested on March quote. <br />The City should also commit to a contractor for the site work as soon as possible to guarantee availability this fall. <br /> <br />Let us know if you have any questions, <br />Amy Bower <br />Landscape Architect <br /> <br />Attached: Contractor quotes and summary spread sheet
The URL can be used to link to this page
Your browser does not support the video tag.