PROJE2017 ELK RIVER BALLFIELD DUGOUTSENG EST A&M construction EBERT CBI FLAGSHIP MAC HANSEN DIVERISFIED INSTALLATIONSFLORIDANo. Section Description Unit Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty)1Structural concrete slab and base material 320.00 SF12.00$ 3,840.00$ 28.75$ 9,200.00$ 23.50$ 7,520.00$ 25.00$ 8,000.00$ 9.57$ 3,062.40$ 9.57$ 3,062.40$ -$ -$ -$ -$2INSTALL 8 post steel dug out roof structure - Supplied by OWNER 1.00 EA3,640.00$ 3,640.00$ 6,600.00$ 6,600.00$ 3,857.00$ 3,857.00$ 3,000.00$ 3,000.00$ 4,450.00$ 4,450.00$ -$ -$ -$ -$ 3,640.00$ 3,640.00$36FT HT Chain link fencing and 2 posts- galvanized 68.00 LF45.00$ 3,060.00$ 55.00$ 3,740.00$ 45.89$ 3,120.52$ 40.00$ 2,720.00$ 12.50$ 850.00$ -$ -$ -$ -$ -$ -$4Remove existing chain link fencing and make adjustments 1.00 EA1,500.00$ 1,500.00$ 680.00$ 680.00$ 432.25$ 432.25$ 900.00$ 900.00$ 250.00$ 250.00$ -$ -$ 2,475.00$ 2,475.00$ -$ -$ Total for each dug out12,040.00$ 20,220.00$ 14,929.77$ 14,620.00$ 8,612.40$ 3,062.40$ 2,475.00$ 3,640.00$ multiply by 8 dugoutsx 8 x 8 x 8 x 8 x 8 x 8 x 8 x 8 BASE BID TOTAL FOR 8 DUGOUTS96,320.00$ 161,760.00$ 119,438.16$ 116,960.00$ combo 68,899.20$ 24,499.20$ 19,800.00$ 29,120.00$W/MAC CONCRETE $12,240 per 4 FTG $755 EACH DUG OUTNo. Section Description Unit Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty) Unit Price Total (unit x qty)1Additional concrete material for concrete slab to support CMU 1.00 LS800.00$ 800.00$ 800.00$ 800.00$ 388.30$ 388.30$ -$ -$ -$ -$ -$ -$ -$ -$ -$ -$2Difference to install 4ft ht chainlink at CMU wall instead of 6ft ht 42.00 LF(2.00)$ (84.00)$ 42.86$ 1,800.12$ 1.38$ 57.96$ -$ -$ 10.50$ 441.00$ -$ -$ -$ -$ -$ -$3Add CMU wall and cap around posts at YAC park only 42.00 LF60.00$ 2,520.00$ 85.72$ 3,600.24$ 196.54$ 8,254.68$ -$ -$ 102.08$ 4,287.36$ 102.08$ 4,287.36$ -$ -$ -$ -$ Total for each dug out3,236.00$ 6,200.36$ 8,700.94$ -$ 4,728.36$ 4,287.36$ -$ -$ multiply by 4 dugoutsx 4x 4x 4x 4x 4x 4x 4 x 4OPTIONAL WORK TOTAL FOR 4 DUGOUTS AT YAC12,944.00$ corrected 24,801.44$ 34,803.76$ -$ combo 18,913.44$ 17,149.44$ -$ -$math error29,768.00$MAC - CMU and conc. 2 dug outs $ 8,575.00Est. Qty.Est. Qty.A. BASE BID WORK AT YAC AND OAK KNOLL PARKSB. UNIT PRICING for optional work at 4 DUGOUTS AT YAC PARK ONLY1 of 1ELK RIVER DUGOUTS
|