Laserfiche WebLink
Crty of <br /> ElkMemorandum <br /> River <br /> To: Planning Department <br /> From: Brandon Wisner,Stormwater Coordinator <br /> Date: August 4,2017 <br /> Subject: Site Plan Review Meeting—August 7,2017 <br /> The department listed above has reviewed the application(s) listed below and has the following <br /> comments: <br /> 1. Parent Builders <br /> 1. Support the requested variance as it is the least impact option due to the limited <br /> access to the property. <br /> 2. Swan Companies/Coborns <br /> 1. Maintain 20'wide easement centered on proposed stormwater pipe location. <br /> 3. DHJ Plat <br /> 1. No concerns or issues with the application as proposed. <br /> 4. Trace Heights 2"d Addition <br /> 1. Issued NPDES permit before grading work can occur. <br /> 2. Submit MIDS water quality report. <br /> 3. Submit Full SWPPP plan and construction project sequencing. <br /> 4. Recommend moving the outlet pipe EOF for Pond 100 east so it would <br /> discharge onto city owned park property. Also,add articulated block energy <br /> dissipation for stormwater pipe outfall into this pond. <br /> 5. Provide storm pipe material spec.,and typical section for pipe crossings <br /> 5. Aquaponics <br /> 1. Stormwater management requirements will need to be met as listed in Ordinance <br /> Sec. 78-503. - Stormwater and urban runoff control. and Sec. 78-504. - Post <br /> construction stormwater management for proposed impervious surfaces. <br /> http://mn-\ elkriver.civicplus.com/DocumentCenter/View/3180 <br /> 2. Submit soil borings to determine saturated soils/groundwater elevation for the <br /> proposed stormwater basin. If adequate separation from the saturated soils can be <br /> achieved (3' from bottom of proposed basin),an infiltration basin may work on the <br /> site,which would take up less area on the property. <br /> 6. Fence <br />