Laserfiche WebLink
PAY ESTIMATE #4 <br />CITY OF ELK RIVER <br />2017 Street Improvements <br />REM <br />NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT <br />UNIT PRICE CONTRACT AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$2,396.86 <br />2396.86 <br />0.5 <br />1198.43 <br />2 <br />REMOVE CONCRETE CURB AND GUTTER <br />70 <br />LF <br />$17,83 <br />1248.10 <br />$ <br />3 <br />MILL BITUMINOUS SURFACE <br />7800 <br />BY <br />$1.90 <br />15444.00 <br />2,022 <br />$ 4003.56 <br />4 <br />TYPE SP 9.5 WEARING COURSE MIXTURE 2C <br />1320 <br />TON <br />$52.38 <br />69141.60 <br />352.85 <br />$ 18482.28 <br />5 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />750 <br />GAL <br />$3.07 <br />2302.50 <br />230 <br />706.10 <br />6 <br />ADJUST VALVE BOX <br />12 <br />EACH <br />$76.46 <br />$ 917.52 <br />] <br />IADJUST MANHOLE <br />1 6 1 <br />EACH <br />SIRSAG <br />I S 11]2.94 I <br />$ <br />8 <br />CONCRETE CURB AND GUTTER <br />70 <br />LF <br />2169.60 <br />$ <br />9 <br />STORM DRAIN INLET PROTECTION <br />20 <br />EACH <br />2 804.6010 <br />TRAFFIC CONTROL <br />1 <br />LS <br />K$,31.28 <br />$ 1348.3611 <br />COMMON TOPSOIL BORROW LV <br />30 <br />CY$ <br />1569.6012 <br />TURF ESTABLISHMENT <br />1 <br />LS <br />1156.56 <br />$ <br />SUMMARY OF WORK COMPLETED TO DATE <br />Bid Schedule "A' <br />Bid Schedule "B" <br />Bid Schedule "C" <br />Bid Schedule "D" <br />Bid Schedule "E" <br />Bid Schedule "F" <br />Schedule "G" <br />Schedule "H" <br />TOTAL WORK COMPLETED TO DATE <br />SAMunidplWeilr eAER303\PAY ESTIMATEMER303 PE PE -8 <br />$ 24.390.37 <br />f <br />460,720.25 <br />f 468,182.13 <br />$ <br />500,287.45 <br />f 529,754.86 <br />—$ <br />581,685.06 <br />$ 598.649.53 <br />$ <br />199,447.07 <br />f <br />f <br />210,633.96 <br />f <br />f <br />1,820.961.43 <br />f 867,118.94 <br />$ 40,551.69 <br />$ 24.390.37 <br />f 2.528,647.52 <br />