Laserfiche WebLink
City of Elk River, Minnesota <br /> Tax Increment Applications for Proposed Jackson Hill Residential Suites Housing Project and <br /> Elk River Lodge and Residential Suites, LLC <br /> April 25,2017 <br /> Page 9 <br /> (4) upon filing the request for certification of the tax capacity of the parcel as part of a district, the authority notifies the <br /> county auditor that the original tax capacity of the parcel must be adjusted as provided by section 469.177, <br /> subdivision 1, paragraph (f). <br /> For purposes of this subdivision, a parcel is not occupied by buildings, streets, utilities, paved or gravel parking lots, <br /> or other similar structures unless 15 percent of the area of the parcel contains buildings, streets, utilities, paved or <br /> gravel parking lots, or other similar structures. <br /> For districts consisting of two or more noncontiguous areas,each area must qualify as a redevelopment district under <br /> paragraph (a)to be included in the district, and the entire area of the district must satisfy paragraph(a). <br /> At least 90 percent of the revenues derived from tax increments from a redevelopment district or renewal and <br /> renovation district must be used to finance the cost of correcting conditions that allow designation of redevelopment <br /> and renewal and renovation districts under section 469.174. These costs include, but are not limited to, acquiring <br /> properties containing structurally substandard buildings or improvements or hazardous substances, pollution, or <br /> contaminants, acquiring adjacent parcels necessary to provide a site of sufficient size to permit development, <br /> demolition and rehabilitation of structures, clearing of the land, the removal of hazardous substances or remediation <br /> necessary to development of the land, and installation of utilities, roads, sidewalks, and parking facilities for the site. <br /> The allocated administrative expenses of the authority, including the cost of preparation of the development action <br /> response plan, may be included in the qualifying costs. <br /> The term of a Redevelopment District is 25 years after receipt of first increment. <br />