My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. SR 07-19-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
07/19/1999
>
4.3. SR 07-19-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:20 AM
Creation date
3/3/2005 3:59:26 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/19/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />· The St. Cloud Area 2020 Bicycle/Pedestrian plan shows bicycle opportunities within the <br />Northstar Corridor on either side of, and adjacent to the Mississippi River from south of the <br />City at approximately CR 115 to north of 12th Street North. <br /> <br />. <br /> <br />Recommendations under this strategy as part of the TSM Alternative include a multi-modal <br />bike/transit approach: <br /> <br />· Constructing and/or distinguishing an aggregate of approximately 10-15 additional miles of <br />bicycle lanes that will focus on access to the proposed transit stations. This would include <br />two to three miles of bicycle lanes directed at each of the stations in the Cities of Rice, Clear <br />Lake, Becker, Big Lake and Elk River. <br />· Bicycle storage facilities at each of the proposed transit stations. <br />· Designating one luggage bay on each motor coach for the storage of bicycles. <br /> <br />This approach would allow individuals to access transit at the home station, ride the express bus <br />to the work station, and bike to the place of work to complete their trip. This would be reversed <br />for the return trip. <br /> <br />The maps on the following pages illustrate the TSM Alternative for the St. Cloud metropolitan <br />area, Sherburne County, Anoka County and the Twin Cities metropolitan area. The maps depict <br />the proposed commuter express bus service and new improvements/facilities along the corridor <br />to supplement that service. The TSM Alternative is shown utilizing enhanced colors, while the <br />existing services (No-Build Alternative) is shaded in the background. <br /> <br />. <br /> <br />. <br /> <br />Phase II Northstar Corridor Major Investment Study <br />Draft - TSM Alternative <br /> <br />18 <br />June 24, 1999 <br />
The URL can be used to link to this page
Your browser does not support the video tag.