My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 ERMUSR 07-11-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2017
>
07-11-2017
>
5.3 ERMUSR 07-11-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2017 2:37:40 PM
Creation date
7/10/2017 2:37:37 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Third,there is not any available Right Of Way along this section of CSAH 39. And with <br /> underground facilities, ERMU's space needs would double. Without any ROW available, ERMU <br /> would need to purchase easements from the property owners. This would likely be very costly. <br /> And lastly, without Wright County issuing plans and starting the CSAH 39 upgrade project there <br /> is no way of guaranteeing that ERMU would be in the way of the road upgrade. <br /> The Terms <br /> Staff has had a number of conversations with the Otsego City Engineer regarding the proposed <br /> terms of a transfer. These are the terms which ERMU staff is recommending: <br /> 1. The transfer would include 101 fixtures and 7 missing fixtures identified on the attached <br /> exhibits. The transfer would also include the underground wiring, control cabinets, and <br /> all related electrical infrastructure related to these streetlights. <br /> 2. This transfer would be contingent upon an extension to the requirement to underground <br /> ERMU's facilities discussed during the January 14, 2008, Otsego City Council meeting. <br /> That extension would delay ERMU's requirement to underground those facilities until <br /> that section of CSAH 39 is upgraded and additional ROW is secured by the County <br /> which ERMU would be able to use. <br /> 3. The transferred lights would be subject to fees as approved by the ERMU Commission <br /> annually and published as part of the ERMU Fee Schedule. Currently, there would be 52 <br /> streetlights/locations that would be subject to the $15/month fixed fee and 56 <br /> streetlights/locations that would be subject to the $9/month fixed fee. These fees are <br /> subject to change under ERMU Commission's authority. These fees are the same fees <br /> used for the other streetlights within ERMU's electric service territory including those <br /> located within the City of Elk River. <br /> 4. ERMU would have the authority to select the streetlight style for fixtures replaced. <br /> 5. The transfer would include a prorated and reduced aide to construction totaling $35,000. <br /> 6. If the City of Otsego wanted to upgrade the Otsego Waterfront lights to match the future <br /> lights selected for downtown Elk River, this option would come with a $1,000 per fixture <br /> premium. <br /> Staff recommends the Commission approve the terms as described and give staff authority to <br /> develop an asset transfer agreement and CSAH 39 overhead to underground electric system <br /> relocation extension agreement. <br /> ATTACHMENTS: <br /> • Proposed 2017 City of Otsego Street Light Transfer Areas—Exhibit A <br /> • Proposed 2017 City of Otsego Street Light Transfer Areas—Exhibit B <br /> • Proposed 2017 City of Otsego Street Light Transfer Areas—Exhibit C <br /> • Proposed 2017 City of Otsego Street Light Transfer Areas—Exhibit D <br /> • 2017 ERMU Street/Security Light Service Tariff <br /> • 2017 ERMU Fee Schedule <br /> • Otsego City Council Meeting Minutes— 1/14/2008 <br /> Page 3 of 3 <br /> 195 <br />
The URL can be used to link to this page
Your browser does not support the video tag.