My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.5 ERMUSR 07-11-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
07-11-2017
>
2.5 ERMUSR 07-11-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2017 2:03:58 PM
Creation date
7/10/2017 2:03:51 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
7/11/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. Resource Sustainability <br /> Monitoring-Key DNR Benchmark <br /> Complete Table 8 by inserting information about source water quality monitoring efforts.The list should <br /> include all production wells, observation wells, and source water intakes or reservoirs. Additional <br /> information on groundwater level monitoring program at: <br /> http://www.dnr.state.mn.us/waters/groundwater section/obwell/index.html <br /> Table 8.Information about source water quality monitoring <br /> MN Unique Well# • Production Well • Routine MDH • Monthly • Grab Sampling <br /> 255153 sampling <br /> • Routine water <br /> utility sampling <br /> MN Unique Well# • Production Well • Routine MDH • Monthly • Grab Sampling <br /> 221176 sampling <br /> • Routine water <br /> utility sampling <br /> MN Unique Well# • Production Well • Routine MDH • Monthly • Grab Sampling <br /> 481794 sampling <br /> • Routine water <br /> utility sampling <br /> MN Unique Well# • Production Well • Routine MDH • Monthly • Grab Sampling <br /> 537682 sampling <br /> • Routine water <br /> utility sampling <br /> MN Unique Well# • Production Well • Routine MDH • Monthly • Grab Sampling <br /> 580320 sampling <br /> • Routine water <br /> utility sampling <br /> MN Unique Well# • Production Well • Routine MDH • Monthly • Grab Sampling <br /> 664852 sampling <br /> • Routine water <br /> utility sampling <br /> MN Unique Well# • Production Well • Routine MDH • Monthly • Grab Sampling <br /> 694499 sampling <br /> • Routine water <br /> utility sampling <br /> MN Unique Well# • Production Well • Routine MDH • Monthly • Grab Sampling <br /> 757624 sampling <br /> • Routine water <br /> utility sampling <br /> Water Level Data <br /> A water level monitoring plan that includes monitoring locations and a schedule for water level readings <br /> must be submitted as Appendix 2. If one does not already exist, it needs to be prepared and submitted <br /> with the WSP. Ideally, all production and observation wells are monitored at least monthly. <br /> 17 <br /> 57 <br />
The URL can be used to link to this page
Your browser does not support the video tag.