Option 1— Cultured Stone <br /> This option required a field stone-style product. Cultured stone is man-made or <br /> manufactured. <br /> Option 2—Natural Field Stone <br /> This option required modifications to the existing design requiring additional engineering <br /> design standards to support the structure due to the size and weight of natural field stone. <br /> This option also required the contractor to pick the stone from an Elk River location. <br /> When the bids were opened, only 3 of the 5 companies bid on Option 2 (natural field stone). <br /> Possible reasons this option may not have been bid by all bidders: <br /> 1. The stone was required to be picked from an Elk River pit and could not be cut. <br /> 2. Engineering standards required to support the structure <br /> 3. Some companies manufacture in an indoor, climate-controlled environment where <br /> they ensure a consistent, square and level product prior to onsite installation. With <br /> the natural field stone option they would need to build the signs onsite. <br /> Graphic House Inc. <br /> Graphic was the low bidder under Option #1 (cultured stone). Their product was not a <br /> cultured stone product but rather a real field stone with a veneer that is cut. <br /> Description Cost Each Quantity Total <br /> Primary Gateway Sin with one Tier of Stone 36,055.67 4 144,222.68 <br /> Primary Vertical Park (double-faced) 21,983.34 5 109,916.70 <br /> Secondary Vertical Park double-faced 14,277.43 10 142,274.30 <br /> 4-Sided Kiosk 14,876.79 5 74,383.95 <br /> Tertiary Park on Pole 2,093.20 14 29,304.80 <br /> Downtown Primary Direction Sin 1,876.79 5 9,383.95 <br /> Single Parking Signs 1,048.55 7 7,339.85 <br /> Parking Sign Employees Only 1,048.55 1 1,048.55 <br /> Welcome Signage 2,159.06 19 41,022.14 <br /> Grand Total 558,896.92 <br /> Nordquist Sign Company <br /> Nordquist was the low bidder under Option #2, the natural field stone. <br /> Description Cost Each Quantity Total <br /> Primary Gateway Sin with one Tier of Stone $47,979 4 $191,916 <br /> Primary Vertical Park double-faced 27,279 5 136,395 <br /> Secondary Vertical Park double-faced 11,750 10 117,500 <br /> 4-Sided Kiosk 20,070 5 100,350 <br /> Tertiary Park on Pole 2,010 14 28,140 <br /> Downtown Primary Direction Sin 1,265 5 6,325 <br /> Single Parking Signs 1,090 7 7,630 <br /> Parking Sin Employees Only 1,215 1 1,215 <br /> Welcome Signage 2,548 19 48,412 <br /> Grand Total $637,883.00 <br /> N:APublic Bodies\Agenda Packets\07-03-2017\Final\x8.1 ot2 2017 Wapfinding 1N1emo.docx <br />