My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-05-2017 CCM
ElkRiver
>
City Government
>
City Council
>
Council Minutes
>
City Council 1974 - Present
>
2010-2019
>
2017
>
06-05-2017 CCM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2017 12:49:15 PM
Creation date
6/28/2017 12:49:07 PM
Metadata
Fields
Template:
City Government
type
CCM
date
6/5/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Minutes <br />June 5, 2017 <br />Page 5 <br />Mr. Carlton indicated this plat is still preliminary and when the developer comes to <br />receive the final plat approval and building permits, the city would look at those <br />future development connections. He stated Lots 297 and 299 are buildable and will <br />require some additional grade changes. <br />Moved by Councilmember Westgaard and seconded by Councilmember <br />Olsen to approve the proposed update to the Preliminary Plat for Miske <br />Meadows, with the following conditions: <br />1. Updated engineering and utility plans must be approved by city staff. <br />2. An updated Planned Unit Development agreement for Miske <br />Meadows must be approved by the City Council. <br />3. The sidewalk along the south side of wetland #2 must include <br />pedestrian ramps on both sides of Johnson Street and Ivanhoe Drive. <br />The mid -block pedestrian crossings also need to be striped and signed <br />according to established standards. <br />4. Rear yard drainage easements for all parcels abutting the new <br />stormwater basin must encompass the 928 contour line. <br />5. All mailboxes shall be clustered. <br />Motion carried 5-0. <br />Moved by Councilmember Wagner and seconded by Councilmember Olsen <br />to adopt Resolution 17-27 granting final plat approval for Miske Meadows <br />Third Addition, with the following conditions: <br />1. A Development Agreement must be signed by the city and developer <br />prior to releasing the final plat for recording. <br />2. Staff approval of updated Final Plat document <br />3. Park Dedication shall be paid at 90.64% of the current rate, based on <br />credit for land dedication in the preliminary plat. (currently <br />$1,425.93/unit). <br />4. Surface Water Management Impact Fee be paid in the amount <br />required by the city when the Final Plat is released for recording <br />(currently $233/lot). <br />5. Water Availability Charge shall be paid in the amount required by the <br />city when the Final Plat is released for recording (currently $345/ <br />plumbing unit). <br />6. A Letter of Credit shall be provided to the city in the amount of 100% <br />of the costs of the public improvements. <br />7. Upon completion of all improvements and acceptance by the city, a <br />security or warranty in a form acceptable to the city engineer must be <br />secured. <br />8. Development Plan shall be approved by the city engineer prior to <br />issuance of building permits. <br />9. Any item or condition found that indicates the site is likely to yield <br />information important to pre -history or history shall be reported to the <br />city immediately. Further, the city reserves the right to stop work <br />P O M E A f B B I <br />NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.