Laserfiche WebLink
The facility will not be served by city services and there does not appear to be any other po <br />th <br />impacts to public facilities or services. Baldwin St. NW and 225Avenue NW are currently used for <br />gravel mine hauling from neighboring operations. This operation iction rules. <br />5.Will not involve uses, activities, processes, materials, equipme <br />detrimental to any persons or property because of excessive traf <br />vibrations. <br /> This proposal underwent an Environmental Assessment Worksheet (EAW) with the City of Elk <br />River to determine the potential environmental effects of the opcity determined that the <br />proposed operation would not result in non-reclaimable environmental degradation. The conditions <br />outlined in this CUP are in place to minimize the effects of noi <br />for gravel mine operations. <br />6. Will not result in the destruction, loss or damage of a natural, of major importance. <br /> This proposal underwent an EAW with the City of Elk River to determine the potential <br />environmental effects of the operation. The city determined that the proposed operation would not <br />result in non-reclaimable environmental degradation. The reclamation plan to be developed by the <br />operation and submitted to staff will return the property to environmental standards. No historic <br />features were identified through the EAW process. <br />7. Will fully comply with all other requirements of this Code, including any applicable requirements and <br />Standards for the issuance of a license or permit to establish a <br />The applicant is required to comply with all other sections of tequired <br />building permits in addition to the Conditional Use Permit. The proposed use will comply with MN <br />Rules Chapter 7030, Noise Pollution Control for all sites during all operating hours. <br /> <br />If denial of such a permit should occur, it shall accompany recommendations or determinations by <br />findings or a report stating how the proposed use does not compl <br />30-654. <br />In the review of the standards for CUP as outlined, it appears t <br />these standards. <br />Financial Impact <br /> <br />None <br /> <br />Attachments <br /> <br />Location Map <br />Application for Amendment to CUP for Mineral Excavation dated Ma <br />Previous recorded document (CU 07-08) <br /> <br />N:\Departments\Community Development\Planning\Case Files\CUP\CU 17-14 Tiller\4-Planning Commission\4.3_CU 17-14 Tiller PC <br />Report.docx <br />