|
Beaudry Redevelopment TIF District #24
<br /> Replacement Cost Report
<br /> ns d5W Square Foot Cost Estimate Report Date: 6/2/2017
<br /> Estimate Name: 634 Quinn Ave NW
<br /> City of Elk River
<br /> 634 Quinn Ave, Elk River, Minnesota,55330
<br /> Economy 1 Story with Wood Siding-Wood
<br /> Building Type: Frame
<br /> Location: MINNEAPOLIS,MN
<br /> Story Count: 1 ,
<br /> Story Height(LF.): 8
<br /> Floor Area (S.F.): 930 ALM ?3
<br /> Labor Type: RESP —z:.. •.-•.- _
<br /> Basement Included: No
<br /> Data Release: Year 2017 Quarter Costs are derived from a building model with basic components.
<br /> Cost Per Square Foot: $126.37 Scope differences and market conditions can cause costs to vary significantly.
<br /> Building Cost: $117,525.95
<br /> of Total Cost Per S.F. Cost
<br /> 01 Site Work
<br /> Footing excavation, building,26'x 46',4' deep 3.26 3,027.89
<br /> 02 Foundation
<br /> Footing systems, 10"thick by 20"wide footing 3.09 2,877.19
<br /> Block wall systems,8"wall,grouted,full height 10.97 10,200.14
<br /> Floor slab systems,4"thick slab 4.32 4,019.26
<br /> 03 Framing
<br /> Exterior wall framing systems, 2"x 4", 16"OC 4.96 4,616.63
<br /> Exterior wall framing systems, 2"x 4", 16"OC 0.47 437.4
<br /> Truss roof framing systems,24"OC,4/12 pitch, 1' overhang,26'span 7.23 6,719.99
<br /> Partition framing systems,2"x 4", 16"OC 3.11 2,896.02
<br /> 04Exterior Walls
<br /> �
<br /> Metal&plastic siding systems,vinyl clapboard siding, 8"wide,white 0.63 589.73
<br /> Metal&plastic siding systems,vinyl clapboard siding, 8"wide,white 6.69 6,224.45
<br /> Non-rigid insul, batts,fbgls, kraft faced,3-1/2"thick, R13, 15"W 0.84 777.43
<br /> Non-rigid insul, batts,fbgls, kraft faced, 12"thick, R38,23"wide 1.63 1,515.66
<br /> Sliding window systems, builder's quality wood window,3'x 2' 7.33 6,817.04
<br /> Door systems, solid core birch,flush,3'x 6'-8" 2.99 2,779.03
<br /> Storm door,al, combination,storm&screen,anodized, 3'-0"x 6'-8" 0.91 843.77
<br /> 05 Roofing �.
<br /> Gable end roofing,asphalt, roof shingles,class A 5.49 5,109.52
<br /> 0. Interiors
<br /> Wall system, 1/2"drywall,taped&finished 9.18 8,533.98
<br /> Wall system, 1/2"drywall,taped&finished 3.41 3,173.20
<br /> 1/2"gypsum wallboard,taped&finished ceilings 2.74 2,546.67
<br /> Beaudry Redevelopment TIF District#24 Replacement Cost Report
<br /> LHB Project No. 170323 Page 1 of 2 Parcel B, Residence
<br />
|