Laserfiche WebLink
Beaudry Redevelopment TIF District #24 <br /> Replacement Cost Report <br /> ns d5W Square Foot Cost Estimate Report Date: 6/2/2017 <br /> Estimate Name: 634 Quinn Ave NW <br /> City of Elk River <br /> 634 Quinn Ave, Elk River, Minnesota,55330 <br /> Economy 1 Story with Wood Siding-Wood <br /> Building Type: Frame <br /> Location: MINNEAPOLIS,MN <br /> Story Count: 1 , <br /> Story Height(LF.): 8 <br /> Floor Area (S.F.): 930 ALM ?3 <br /> Labor Type: RESP —z:.. •.-•.- _ <br /> Basement Included: No <br /> Data Release: Year 2017 Quarter Costs are derived from a building model with basic components. <br /> Cost Per Square Foot: $126.37 Scope differences and market conditions can cause costs to vary significantly. <br /> Building Cost: $117,525.95 <br /> of Total Cost Per S.F. Cost <br /> 01 Site Work <br /> Footing excavation, building,26'x 46',4' deep 3.26 3,027.89 <br /> 02 Foundation <br /> Footing systems, 10"thick by 20"wide footing 3.09 2,877.19 <br /> Block wall systems,8"wall,grouted,full height 10.97 10,200.14 <br /> Floor slab systems,4"thick slab 4.32 4,019.26 <br /> 03 Framing <br /> Exterior wall framing systems, 2"x 4", 16"OC 4.96 4,616.63 <br /> Exterior wall framing systems, 2"x 4", 16"OC 0.47 437.4 <br /> Truss roof framing systems,24"OC,4/12 pitch, 1' overhang,26'span 7.23 6,719.99 <br /> Partition framing systems,2"x 4", 16"OC 3.11 2,896.02 <br /> 04Exterior Walls <br /> � <br /> Metal&plastic siding systems,vinyl clapboard siding, 8"wide,white 0.63 589.73 <br /> Metal&plastic siding systems,vinyl clapboard siding, 8"wide,white 6.69 6,224.45 <br /> Non-rigid insul, batts,fbgls, kraft faced,3-1/2"thick, R13, 15"W 0.84 777.43 <br /> Non-rigid insul, batts,fbgls, kraft faced, 12"thick, R38,23"wide 1.63 1,515.66 <br /> Sliding window systems, builder's quality wood window,3'x 2' 7.33 6,817.04 <br /> Door systems, solid core birch,flush,3'x 6'-8" 2.99 2,779.03 <br /> Storm door,al, combination,storm&screen,anodized, 3'-0"x 6'-8" 0.91 843.77 <br /> 05 Roofing �. <br /> Gable end roofing,asphalt, roof shingles,class A 5.49 5,109.52 <br /> 0. Interiors <br /> Wall system, 1/2"drywall,taped&finished 9.18 8,533.98 <br /> Wall system, 1/2"drywall,taped&finished 3.41 3,173.20 <br /> 1/2"gypsum wallboard,taped&finished ceilings 2.74 2,546.67 <br /> Beaudry Redevelopment TIF District#24 Replacement Cost Report <br /> LHB Project No. 170323 Page 1 of 2 Parcel B, Residence <br />