Laserfiche WebLink
PAY ESTIMATE #1 <br />CITY OF ELK RIVER <br />2017 Street Improvements <br />S:\Municipal\Aelkriver\ER303\PAY ESTIMATES\ER303 PE PE - 7 <br />ITEM <br />NO.ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY UNIT <br />CONTRACT <br />UNIT PRICE CONTRACT AMOUNT <br />USED TO <br />DATE EXTENSION <br />61 CONCRETE CURB AND GUTTER DESIGN B618 2559 LIN FT $12.79 32,729.61$ -$ <br />62 6" CONCRETE DRIVEWAY PAVEMENT 1,397 SQ YD $52.97 73,999.09$ -$ <br />63 7" CONCRETE DRIVEWAY PAVEMENT 106 SQ YD $77.04 8,166.24$ -$ <br />64 8" CONCRETE DRIVEWAY PAVEMENT 73 SQ YD $57.78 4,217.94$ -$ <br />65 CONCRETE DRAINAGE FLUME 61 SQ YD $115.56 7,049.16$ -$ <br />66 TRUNCATED DOMES 170 SQ FT $48.15 8,185.50$ -$ <br />67 BITUMINOUS CURB 1,710 LIN FT $2.14 3,659.40$ -$ <br />68 MAILBOX SUPPORT 15 EACH $101.65 1,524.75$ -$ <br />69 INSTALL MAILBOX SUPPORT 104 EACH $42.80 4,451.20$ -$ <br />70 TRAFFIC CONTROL 0 LUMP SUM $79,859.18 35,138.04$ -$ <br />71 INSTALL SIGN SUPPORT 17 EACH $80.25 1,364.25$ -$ <br />72 ADJUST HANDHOLE 2 EACH $428.00 856.00$ -$ <br />73 RIGID PVC LOOP DETECTOR 6'x6'4 EACH $909.51 3,638.04$ -$ <br />74 SILT FENCE, TYPE MS 2,280 LIN FT $1.87 4,263.60$ -$ <br />75 STORM DRAIN INLET PROTECTION 44 EACH $90.95 4,001.80$ 6 545.70$ <br />76 SEDIMENT CONTROL LOG TYPE COMPOST 3450 LIN FT $1.87 6,451.50$ -$ <br />77 STABILIZED CONSTRUCTION EXIT 0 LUMP SUM $5,200.25 2,288.11$ -$ <br />78 CULVERT END CONTROLS 2 EACH $240.76 481.52$ -$ <br />79 FERTILIZER TYPE 1 2,173 POUND $1.02 2,216.46$ -$ <br />80 COMMON TOPSOIL BORROW (LV)1,092 CU YD $35.85 39,148.20$ -$ <br />81 SEEDING 7 ACRE $374.50 2,640.23$ -$ <br />82 SEED MIXTURE 25-131 1,549 POUND $3.20 4,956.80$ -$ <br />83 EROSION CONTROL BLANKETS CATEGORY 3 3,125 SQ YD $1.55 4,843.75$ -$ <br />84 HYDRAULIC NATURAL TACKIFIER 30,922 SQ YD $0.75 23,191.50$ -$ <br />85 EROSION CONTROL 0 LUMP SUM $3,210.02 1,412.41$ -$ <br />86 PAVEMENT MESSAGE EPOXY 45 SQ FT $5.73 257.85$ -$ <br />87 4" SOLID LINE EPOXY 2959 LIN FT $0.31 917.29$ -$ <br />88 24" SOLID LINE EPOXY 43 LIN FT $6.88 295.84$ -$ <br />89 4" BROKEN LINE EPOXY 622 LIN FT $0.31 192.82$ -$ <br />90 4" DOUBLE SOLID LINE EPOXY 1,180 LIN FT $0.62 731.60$ -$ <br />91 CROSSWALK EPOXY 270 SQ FT $3.67 990.90$ -$ <br />1,824,961.43$ 16,595.70$ <br />BID SCHEDULE "F" - LOCAL FUNDING - CONTINUED <br />Total Bid Schedule "F"