Laserfiche WebLink
PAY ESTIMATE #1 <br />CITY OF ELK RIVER <br />2017 Street Improvements <br />S:\Municipal\Aelkriver\ER303\PAY ESTIMATES\ER303 PE PE - 6 <br />ITEM <br />NO.ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY UNIT <br />CONTRACT <br />UNIT PRICE CONTRACT AMOUNT <br />USED TO <br />DATE EXTENSION <br />1 MOBILIZATION 0.44 LUMP SUM $80,250.00 35,310.00$ 0.20 16,050.00$ <br />2 CLEARING 0.1 ACRE $21,698.20 2,169.82$ -$ <br />3 CLEARING 2 TREE $183.37 366.74$ -$ <br />4 GRUBBING 0.1 ACRE $14,363.70 1,436.37$ -$ <br />5 GRUBBING 3 TREE $103.91 311.73$ -$ <br />6 REMOVE CURB AND GUTTER 2,629 LIN FT $3.23 8,491.67$ -$ <br />7 REMOVE SEWER PIPE (STORM)166 LIN FT $11.05 1,834.30$ -$ <br />8 REMOVE CONCRETE PAVEMENT 6,942 SQ FT $2.61 18,118.62$ -$ <br />9 REMOVE CONCRETE WALK 990 SQ FT $2.09 2,069.10$ -$ <br />10 REMOVE BITUMINOUS PAVEMENT 5,348 SQ YD $4.43 23,691.64$ -$ <br />11 REMOVE RIPRAP 27 CU YD $38.67 1,044.09$ -$ <br />12 SAWING CONCRETE PAVEMENT (FULL DEPTH)728 LIN FT $3.16 2,300.48$ -$ <br />13 SAWING BITUMINOUS PAVEMENT (FULL DEPTH)4767 LIN FT $1.98 9,438.66$ -$ <br />14 SALVAGE SIGN SUPPORT 17 EACH $37.45 636.65$ -$ <br />15 SALVAGE CASTING 22 EACH $110.48 2,430.56$ -$ <br />16 SALVAGE MAILBOX SUPPORT 104 EACH $37.45 3,894.80$ -$ <br />17 LANDSCAPE ALLOWANCE 1 ALLOWANCE $20,000.00 20,000.00$ -$ <br />18 REMOVE MISCELLANEOUS STRUCTURES 1 LUMP SUM $1,070.01 1,070.01$ -$ <br />19 SALVAGE MISCELLANEOUS STRUCTURES 1 LUMP SUM $1,070.01 1,070.01$ -$ <br />20 COMMON EXCAVATION (EV)3,707 CU YD $15.07 55,864.49$ -$ <br />21 SUBGRADE EXCAVATION (EV)6,113 CU YD $16.60 101,475.80$ -$ <br />22 WATER 250 MGAL $27.82 6,955.00$ -$ <br />23 AGGREGATE BASE CLASS 5 33 TON $26.75 882.75$ -$ <br />24 FULL DEPTH RECLAMATION 44993 SQ YD $1.50 67,489.50$ -$ <br />25 HAUL FULL DEPTH RECLAMATION (LV)10,492 CU YD $9.00 94,428.00$ -$ <br />26 HAUL FULL DEPTH RECLAMATION (LV)10,492 CU YD $9.00 94,428.00$ -$ <br />27 SHOULDER BASE AGGREGATE CLASS 2 50 TON $44.94 2,247.00$ -$ <br />28 MILL BITUMINOUS SURFACE (1.5")2,818 SQ YD $1.84 5,185.12$ -$ <br />29 MILL BITUMINOUS SURFACE 5,964 $1.03 6,142.92$ -$ <br />30 BITUMINOUS MATERIAL FOR TACK COAT 3,988 GALLON $2.51 10,009.88$ -$ <br />31 TYPE SP 9.5 WEARING COURSE MIXTURE (2,C)5,114 TON $48.75 249,307.50$ -$ <br />32 TYPE SP 9.5 WEARING COURSE MIXTURE (3,C)1,117 TON $50.35 56,240.95$ -$ <br />33 TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B)6,618 TON $40.58 268,558.44$ -$ <br />34 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) 2.5" THICK 1,241 SQ YD $13.14 16,306.74$ -$ <br />35 TYPE SP 12.5 BITUMINOUS MIXTURE FOR PATCHING 695 TON $67.92 47,204.40$ -$ <br />36 15" CS PIPE CULVERT 64 LIN FT $50.82 3,252.48$ -$ <br />37 12" GS PIPE APRON 1 EACH $248.58 248.58$ -$ <br />38 15" GS PIPE APRON 6 EACH $276.20 1,657.20$ -$ <br />39 15" RC PIPE APRON 3 EACH $828.60 2,485.80$ -$ <br />40 18" RC PIPE APRON 1 EACH $883.84 883.84$ -$ <br />41 24" RC PIPE APRON 2 EACH $1,436.25 2,872.50$ -$ <br />42 15" RC PIPE CULVERT DESIGN 3006 CLASS V 32 LIN FT $66.29 2,121.28$ -$ <br />43 12" RC PIPE SEWER DESIGN 3006 CLASS V 12 LIN FT $52.48 629.76$ -$ <br />44 15" RC PIPE SEWER DESIGN 3006 CLASS V 73 LIN FT $53.03 3,871.19$ -$ <br />45 18" RC PIPE SEWER DESIGN 3006 CLASS III 158 LIN FT $56.34 8,901.72$ -$ <br />46 24" RC PIPE SEWER DESIGN 3006 CLASS III 74 LIN FT $62.97 4,659.78$ -$ <br />47 12" HDPE PIPE SEWER - DIRECTIONAL DRILLED 137 LIN FT $154.67 21,189.79$ -$ <br />48 ADJUST VALVE BOX 7 EACH $303.82 2,126.74$ -$ <br />49 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 9 LIN FT $441.92 4,012.63$ -$ <br />50 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 30 LIN FT $386.68 11,739.60$ -$ <br />51 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 - 4020 4 LIN FT $718.12 3,095.10$ -$ <br />52 CASTING ASSEMBLY 9 EACH $524.78 4,723.02$ -$ <br />53 INSTALL CASTING 22 EACH $110.48 2,430.56$ -$ <br />54 ADJUST FRAME AND RING CASTING 7 EACH $740.22 5,181.54$ -$ <br />55 SEAL CATCH BASIN 31 EACH $155.15 4,809.65$ -$ <br />56 RANDOM RIPRAP CLASS III 25 CU YD $121.53 2,989.64$ -$ <br />57 GEOTEXTILE FILTER TYPE IV 86 SQ YD $5.52 474.72$ -$ <br />58 4" CONCRETE WALK 25 SQ FT $6.37 159.25$ -$ <br />59 6" CONCRETE WALK 990 SQ FT $7.44 7,365.60$ -$ <br />60 CONCRETE CURB AND GUTTER DESIGN B412 18,806 LIN FT $11.72 220,406.32$ -$ <br />BID SCHEDULE "F" - LOCAL FUNDING