Metrics. He noted that the only index that didn't meet our goal was our Customer Average <br /> Duration Index (CADI). There was discussion. <br /> Moved by Commissioner Westgaard and seconded by Commissioner Stewart to <br /> receive and file the APPA eReliability Tracker 2016 Annual Report for Elk River <br /> Municipal Utilities. Motion carried 3-0. <br /> 5.4 Bids for 69kV Substation Transformer <br /> Approved with the 2017 budget was the addition of a new electric substation to be located <br /> adjacent to our existing Waco Substation. One of the larger components of the substation <br /> addition is a 69kV transformer. As the cost of the transformer exceeds the threshold <br /> amount and is subject to competitive bidding law, it was noticed for formal bids. The bid <br /> opening was March 6, 2017. <br /> Mr. Adams presented the 69kV substation transformer bid tabulation and noted that <br /> although the two lowest responsive bidders are effectively the same price,there is a <br /> significant difference in delivery time. Due to the difference in delivery time and the <br /> indirect costs association with extending the construction schedule,the GRE engineers <br /> have recommended choosing the Waukesha transformer. The engineers also recommended <br /> forgoing the short circuit testing that was bid on as the cost greatly exceeds the value. Mr. <br /> Adams informed the Commission that after conferring with legal counsel it would be <br /> acceptable to award the bid to the second lowest bidder based on best value. Staff <br /> recommended awarding the bid for the 69kV substation transformer to MC Sales for the <br /> Waukesha transformer with a 22-26 week delivery window for the amount$543,883. <br /> Moved by Commissioner Westgaard and seconded by Commissioner Stewart to <br /> award the bid for the 69kV substation transformer per the bid package specifications <br /> to MC Sales,Inc. for the Waukesha transformer. Motion carried 3-0. <br /> 5.5 Bids for Electric Wire <br /> The underground electric cable required for the 2017 capital construction projects and <br /> maintenance was determined and had been noticed for formal bids. The bid opening was <br /> on March 13, 2017 at 9:00 a.m. The bid tabulation was distributed at the meeting. Mr. <br /> Adams went over the bid tabulation and explained the difference between firm and <br /> escalated pricing. He also noted that there was only a$150 difference between the two <br /> lowest bids. However,the delivery lead time varied significantly from 4-7 weeks with <br /> Dakota Supply,to 10-12 weeks with Resco. Taking into consideration price,product, and <br /> availability, staff recommended awarding the bid to Dakota Supply with firm pricing. <br /> Moved by Commissioner Stewart and seconded by Commissioner Westgaard to <br /> Page 6 <br /> Special Meeting of the Elk River Municipal Utilities Commission <br /> March 13,2017 <br /> 41 <br />