BID TABULATIONCITY OF ELK RIVER2017 Street ImprovementsER303 bid tabBID TABULATIONBT - 8 OF 14Bids opened Tuesday, March 28, 2017 at 3:00 p.m.There were 7 bids received, as shown herein.ITEM NO.ITEM DESCRIPTION1 MOBILIZATION0.13 LUMP SUM2 CLEARING1.00 TREE3 GRUBBING1TREE4 REMOVE CURB AND GUTTER 4,730 LIN FT5 REMOVE CONCRETE PAVEMENT 990 SQ FT6 REMOVE CONCRETE WALK 750 SQ FT7 SAWING CONCRETE PAVEMENT (FULL DEPTH) 90 LIN FT8 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 103 LIN FT9 SALVAGE CHAIN LINK FENCE 50 LIN FT10 SALVAGE SIGN SUPPORT 3 EACH11 SALVAGE CASTING 13 EACH12 SUBGRADE EXCAVATION (EV)160 CU YD13 WATER100 MGAL14 FULL DEPTH RECLAMATION 17,388 SQ YD15 HAUL FULL DEPTH RECLAMATION (LV) 2,801 CU YD16 HAUL FULL DEPTH RECLAMATION (LV) 416 CU YD17 MILL BITUMINOUS SURFACE (2") 19 SQ YD18 BITUMINOUS MATERIAL FOR TACK COAT 807 GALLON19 TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) 513 TON20 TYPE SP 12.5 WEARING COURSE MIXTURE (3,C) 1,756 TON21 TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B) 2,194 TON22 15" RC PIPE SEWER DESIGN 3006 CLASS V 103 LIN FT23 CONNECT TO EXISTING STORM SEWER 8 EACH24 ADJUST VALVE BOX 5 EACH25 CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 6 LIN FT26 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 37.9 LIN FT27 CASTING ASSEMBLY 10 EACH28 ADJUST FRAME AND RING CASTING 17 EACH29 SEAL CATCH BASIN 13 EACH30 4" CONCRETE WALK 380 SQ FT31 6" CONCRETE WALK 705 SQ FT32 CONCRETE CURB AND GUTTER DESIGN B618 4,730 LIN FT33 8" CONCRETE DRIVEWAY PAVEMENT 177 SQ YD34 TRUNCATED DOMES 100 SQ FT35 INSTALL SALVAGED FENCE 50 LIN FT36 TRAFFIC CONTROL 0.13 LUMP SUM37 INSTALL SIGN SUPPORT 3 EACH38 STABILIZED CONSTRUCTION EXIT 0.13 LUMP SUM39 FERTILIZER TYPE 1 228 POUND40 COMMON TOPSOIL BORROW (LV) 270 CU YD41 SEEDING1.25 ACRE42 SEED MIXTURE 25-131 126 POUND43 HYDRAULIC NATURAL TACKIFIER 2760 SQ YD44 EROSION CONTROL 0.13 LUMP SUM45 PAVEMENT MESSAGE EPOXY 30 SQ FT46 4" SOLID LINE EPOXY 5,535 LIN FT47 24" SOLID LINE EPOXY 42 LIN FT48 4" DOUBLE SOLID LINE EPOXY 345 LIN FT49 CROSSWALK EPOXY 432 SQ FTTotal Bid Schedule AESTIMATED QUANTITYBID SCHEDULE "A" - S.A.P. 204-113-016 - ORONO PARKWAYUNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION$55,000.00 $7,150.00 $183,000.00 $23,790.00 $14,717.85$1,913.32$1,559.00 $1,559.00 $405.45 $405.45 $1,344.00 $1,344.00$678.00 $678.00 $405.45 $405.45 $504.00 $504.00$2.50 $11,825.00 $2.90 $13,717.00 $3.18 $15,041.40$1.75 $1,732.50 $0.85 $841.50 $1.59 $1,574.10$1.00 $750.00 $1.85 $1,387.50 $1.59 $1,192.50$3.75 $337.50 $3.76 $338.40 $5.30 $477.00$3.00 $309.00 $2.50 $257.50 $3.18 $327.54$10.00 $500.00 $26.50 $1,325.00 $21.00 $1,050.00$50.00 $150.00 $38.00 $114.00 $47.25 $141.75$150.00 $1,950.00 $140.00 $1,820.00 $334.09 $4,343.17$20.00 $3,200.00 $14.65 $2,344.00 $24.64 $3,942.40$3.50 $350.00 $33.00 $3,300.00 $22.75 $2,275.00$1.15 $19,996.20 $1.69 $29,385.72 $2.54 $44,165.52$7.75 $21,707.75 $10.75 $30,110.75 $10.33 $28,934.33$14.50 $6,032.00 $12.00 $4,992.00 $7.28 $3,028.48$15.00 $285.00 $44.75 $850.25 $23.91 $454.29$3.00 $2,421.00 $4.15 $3,349.05 $1.30 $1,049.10$67.07 $34,406.91 $54.75 $28,086.75 $114.98 $58,984.74$50.90 $89,380.40 $53.00 $93,068.00 $50.29 $88,309.24$40.85 $89,624.90 $43.00 $94,342.00 $43.98 $96,492.12$38.00 $3,914.00 $48.30 $4,974.90 $55.15 $5,680.45$900.00 $7,200.00 $440.00 $3,520.00 $1,060.61 $8,484.88$350.00 $1,750.00 $368.00 $1,840.00 $359.80 $1,799.00$604.00 $3,624.00 $292.00 $1,752.00 $551.52 $3,309.12$504.00 $19,101.60 $315.00 $11,938.50 $604.55 $22,912.45$700.00 $7,000.00 $800.00 $8,000.00 $551.03 $5,510.30$650.00 $11,050.00 $317.00 $5,389.00 $788.40 $13,402.80$175.00 $2,275.00 $205.00 $2,665.00 $177.75 $2,310.75$5.88 $2,234.40 $5.70 $2,166.00 $5.62 $2,135.60$12.38 $8,727.90 $12.00 $8,460.00 $11.81 $8,326.05$17.10 $80,883.00 $18.65 $88,214.50 $16.33 $77,240.90$79.64 $14,096.28 $77.25 $13,673.25 $76.02 $13,455.54$46.20 $4,620.00 $45.00 $4,500.00 $44.10 $4,410.00$10.00 $500.00 $37.00 $1,850.00 $31.50 $1,575.00$90,750.00 $11,797.50 $88,600.00 $11,518.00 $269,699.00 $35,060.87$195.00 $585.00 $135.00 $405.00 $173.25 $519.75$10,000.00 $1,300.00 $6,500.00 $845.00 $1.00 $0.13$0.77 $175.56 $1.15 $262.20 $1.42 $323.76$25.00 $6,750.00 $21.15 $5,710.50 $32.00 $8,640.00$440.00 $550.00 $4,500.00 $5,625.00 $1,483.78 $1,854.73$3.16 $398.16 $3.15 $396.90 $3.61 $454.86$1.60 $4,416.00 $0.28 $772.80 $0.60 $1,656.00$550.00 $71.50 $6,300.00 $819.00 $4,083.38 $530.84$5.50 $165.00 $9.29 $278.70 $5.25 $157.50$0.30 $1,660.50 $0.32 $1,771.20 $0.28 $1,549.80$6.60 $277.20 $8.29 $348.18 $6.30 $264.60$0.60 $207.00 $0.64 $220.80 $0.57 $196.65$3.52 $1,520.64 $4.73 $2,043.36 $3.36 $1,451.52$491,195.40 $524,190.11 $578,757.85Valley Paving, Inc.C.S. McCrossan Construction, Inc.ASTECH, Inc.
|