My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1 PCSR 03-28-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2017
>
03-28-2017
>
6.1 PCSR 03-28-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2017 2:20:53 PM
Creation date
3/23/2017 9:13:36 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
3/28/2017
case
CU 17-07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Number of Parking Stalls (existing and additional): <br />Existing (currently available to Spectrum High School): <br />High School Building = 130 Stalls <br />6"' Grade Building = 98 Stalls <br />Total Existing Stalls = 228 Stalls <br />Additional Stalls: <br />Stalls existing at 17823 Industrial Circle NW = 75 Stalls <br />Total stalls available to Spectrum High School upon completion of the proposed project: 303 Stalls <br />Is There Proposed Screening of the Site? <br />Screening already exists for the current building. <br />No additional screening is currently being proposed. <br />Proposed Building Materials: <br />17823 Industrial Circle NW is currently constructed. Interior buildout will be steel stud, sheetrock, and cement <br />construction, similar to current 6"' grade building construction. <br />The gymnasium will be built with tilt up cement panels. Interior buildout will be steel stud, sheetrock, and cement <br />construction. <br />How do they comply with applicable design standards? <br />Rivera Architects, Inc. will ensure compliance with all applicable design standards. <br />Signage <br />Spectrum is currently planning one additional sign. <br />The sign will be located at the northwest corner of the newly acquired building located at 17823 Industrial Circle NW. <br />The size of the sign will be up to 36 feet (wide) by 6 feet (high). <br />The sign will be illuminated of aluminum and vinyl construction. <br />Is There Outdoor Storage? <br />No outdoor storage is currently being planned for this site. <br />Spectrum is honored to serve students and families of the Elk River community. We value the relationships built with <br />local businesses and the connections our students have made through their ongoing service learning. We are enthusiastic <br />about growing the school and continuing to provide this educational choice to students and families of the Elk River <br />community. <br />Supplemental Information <br />Attachment A: Letter sent to the City Manager, Cal Portner, and forwarded to City Council members prior to the February <br />6, 2017 City Council Work Session summarizing the school's efforts and framing the rationale for pursuing the property <br />at 17823 Industrial Circle NW. <br />Attachment B: Response to Applicable Regulations <br />We look forward to the working with the City on the proposed expansion project for Spectrum High School. <br />Sincerely, <br />Rick Peterson <br />Director of Athletics and Facilities <br />Spectrum High School <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.