My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6. SR 02-22-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
02/22/2005
>
5.6. SR 02-22-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:14 AM
Creation date
2/18/2005 9:42:53 AM
Metadata
Fields
Template:
City Government
type
SR
date
2/22/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />St. Andrew's Church/CD 04-38 <br />February 22, 2005 <br /> <br />Page 3 <br /> <br />Building Elevations <br /> <br />The exterior of the addition will be concrete panels with some brick to match the existing <br />buildings. It will be two stories high to allow for the high ceiling in the gymnasium and <br />match the existing rooiline of the church. A new entrance will be located on the south side <br />between the addition and the church. It will provide access to the foyer adjacent to the <br />gymnasIum. <br /> <br />Landscaping <br /> <br />Six new trees will be planted in the area of the old church, three ash trees and three pine <br />trees. Other landscaping includes 3 ornamental trees and various shurbs along the sidewalk <br />leading to the new parish center entrance. There is an existing overs tory tree near the <br />intersection of Irving Avenue and 4th Street, between the old church and the parking lot. The <br />applicant should preserve this tree if possible. <br /> <br />Plannina Commission Meetina <br /> <br />At the Planning Commission meeting held on January 25th, no one spoke at the public <br />hearing. The Commission discussed construction and demolition traffic routes and had the <br />building elevations clarified. <br /> <br />Recommendation <br /> <br />The Planning Commission and staff recommend that the City Council approve the <br />conditional use permit to expand St. Andrews Church with the following conditions: <br /> <br />1. All comments of the City Engineer shall be addressed. <br /> <br />2. The traffic route outlined in the City Engineer's memo include both demolition and <br />construction traffic. <br /> <br />S:\pLANNING\Case Files\2004\CU 04-38 St. Andrew's Church\CU04-38CC02-22.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.