Laserfiche WebLink
PRELIMINARY OPINION OF ESTIMATED PROJECT COST <br />WASTE MANAGEMENT -ELK RIVER LEACHATE STUDY <br />CITY OF ELK RIVER MINNESOTA <br />BMI PROJECT NO. T21.109643 <br />ITEM <br />APPROX. <br />UNIT PRICE <br />AMOUNT <br />NO. <br />ITEM DESCRIPTION <br />QUANT. <br />UNIT <br />OPTION 1 A - CONNECTION AT EVANS ST NW & 197TH AVE NW (LINED <br />FMN) <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 50,000.00 <br />$ 50,000 <br />2 <br />TRAFFIC CONTROL <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000 <br />3 <br />4 -INCH PE FORCEMAIN <br />21,220 <br />LF <br />$ 15.00 <br />$ 318,300 <br />4 <br />12 -INCH PE CASING PIPE - DIRECTIONALLY DRILLED <br />21,220 <br />LF <br />$ 75.00 <br />$ 1,591,500 <br />5 <br />LIFT STATION, CONTROLS & SITE WORK <br />1 <br />LS <br />$ 200,000.00 <br />$ 200,000 <br />6 <br />AIR & VACUUM RELEASE MANHOLES <br />10 <br />EA <br />$ 9,000.00 <br />$ 90,000 <br />7 <br />CORE & BOOT SAN MH <br />1 <br />EA <br />$ 3,500.00 <br />$ 3,500 <br />8 <br />INSIDE MH DROP <br />5 <br />LF <br />$ 100.00 <br />$ 500 <br />9 <br />4" GATE VALVE AND BOX <br />22 <br />EA <br />$ 1,200.00 <br />$ 26,400 <br />10 <br />CONNECT TO WASTE MANAGEMENT <br />1 <br />EA <br />$ 5,000.00 <br />$ 5,000 <br />11 <br />METER MANHOLE <br />1 <br />EA <br />$ 12,000.00 <br />$ 12,000 <br />12 <br />EROSION CONTROL <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000 <br />13 <br />TURF RESTORATION <br />1 <br />LS <br />$ 15,000.00 <br />$ 15,000 <br />CONSTRUCTION SUB -TOTAL: $ 2,327,200 <br />CONTINGENCIES (20%) $ 465,440 <br />CONSTRUCTION TOTAL: $ 2,792,640 <br />ENG & ADMIN: $ 558,528 <br />EST. PROJECT COST: $ 3,351,168 <br />ITEM <br />APPROX. <br />UNIT PRICE <br />AMOUNT <br />NO. <br />ITEM DESCRIPTION <br />QUANT. <br />UNIT <br />OPTION 1 B - CONNECTION AT EVANS ST NW & 197TH AVE NW (NON <br />-LINED FMN) <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 50,000.00 <br />$ 50,000 <br />2 <br />TRAFFIC CONTROL <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000 <br />3 <br />4 -INCH PE FORCEMAIN - DIRECTIONALLY DRILLED <br />20,995 <br />LF <br />$ 40.00 <br />$ 839,800 <br />4 <br />4 -INCH PE FORCEMAIN <br />225 <br />LF <br />$ 20.00 <br />$ 4,500 <br />5 <br />12 -INCH PE CASING PIPE (TH 169) - DIRECTIONALLY DRILLED <br />225 <br />LF <br />$ 100.00 <br />$ 22,500 <br />6 <br />LIFT STATION, CONTROLS & SITE WORK <br />1 <br />LS <br />$ 200,000.00 <br />$ 200,000 <br />7 <br />AIR & VACUUM RELEASE MANHOLES <br />10 <br />EA <br />$ 9,000.00 <br />$ 90,000 <br />8 <br />CORE & BOOT SAN MH <br />1 <br />EA <br />$ 3,500.00 <br />$ 3,500 <br />9 <br />INSIDE MH DROP <br />5 <br />LF <br />$ 100.00 <br />$ 500 <br />10 <br />4" GATE VALVE AND BOX <br />22 <br />EA <br />$ 1,200.00 <br />$ 26,400 <br />11 <br />CONNECT TO WASTE MANAGEMENT <br />1 <br />EA <br />$ 5,000.00 <br />$ 5,000 <br />12 <br />METER MANHOLE <br />1 <br />EA <br />$ 12,000.00 <br />$ 12,000 <br />13 <br />EROSION CONTROL <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000 <br />14 <br />TURF RESTORATION <br />1 <br />LS <br />$ 15,000.00 <br />$ 15,000 <br />CONSTRUCTION SUB -TOTAL: $ 1,284,200 <br />CONTINGENCIES (20%) $ 256,840 <br />CONSTRUCTION TOTAL: $ 1,541,040 <br />ENG & ADMIN: $ 308,208 <br />EST. PROJECT COST: $ 1,849,248 <br />