<br />. <br /> <br />5.9 <br /> <br />Capital Cost Estimate <br /> <br />The Contractor will develop preliminary estimates of-capital cost. A capital cost -methodology <br />will be adapted for the Project. The cost estimate will be based on discrete contract units, with <br />descriptions of what each includes and the interface conditions. The capital cost-estimate "Will .-. <br />serve as input to the Financial Plan task. By the end of this phase, a new zero-based capital cost <br />estimate will be provided to serve as a pre-preliminary engineering baseline and as final input to <br />the-financial plan.- <br /> <br />. <br /> <br />. <br /> <br />Work Program for Northstar Corridor MIS and EIS <br />For the Proposed Commuter Rail Service <br />February 25. 1999 <br /> <br />~. <br />.~~ <br /> <br />23 <br />Wark Program <br />