My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 03-15-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
03/15/1999
>
4.4. SR 03-15-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:13 AM
Creation date
2/15/2005 3:14:47 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />provide access from local and regional land uses to the commuter rail connection. This bus <br />improvement option would feed the following options with riders: commuter rail, commuter rail . <br />with Anoka County LRT, and commuter rail with Anoka County HOY. <br /> <br />HOY <br /> <br />The Anoka County HOY alternative assumes construction or implementation of visually or barrier <br />separated lanes for the exclusive use of transit and other high occupancy vehicles. The Anoka <br />County HOY alternative is based on and may include operating and infrastructure improvements <br />designated with the commuter rail alternative. <br /> <br />Light Rail Transit <br /> <br />The light rail transit alternative includes only an operation with commuter rail within Anoka <br />County. The alignment would be connected with the commuter rail alignment with various <br />intermodal facilities located along the corridor within Anoka County. The LRT line would be part <br />of a regional system of LRT facilities within the Twin Cities metropolitan area. The current <br />alignment of the proposed Northeast LRT line begins in downtown Minneapolis and travels to the <br />Northtown Station primarily along TH 47. <br /> <br />TH 10/47 Minor Upgrade <br /> <br />Minor upgrades to the corridor roadway were described in Section IV of this report. Minor <br />upgrades were considered to be addition of right- or left-turn lanes, ITS technologies for traffic . <br />management, access consolidation, frontage road development, signal improvement/coordination, <br />and construction of interchanges at key locations. <br /> <br />TH 10/47 Maior Upgrade <br /> <br />Major upgrades to the corridor roadway were described in Section IV of this report. Major <br />upgrades were considered to be the addition of through lanes, construction of bypasses, and <br />construction of a fully-controlled access freeway. <br /> <br />The next step in the screening process was to evaluate the modal elements of the transportation <br />strategies and to recommend those multi-modal transportation strategies that should be carried <br />forward into Phase II of the MIS. <br /> <br />. <br /> <br />Northstar Corridor Major Investment Study <br />Conceptual Definition of Alternatives <br />February 1999 <br /> <br />V-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.