My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.4. SR 03-15-1999
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
1993 - 1999
>
1999
>
03/15/1999
>
4.4. SR 03-15-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:13 AM
Creation date
2/15/2005 3:14:47 PM
Metadata
Fields
Template:
City Government
type
SR
date
3/15/1999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
96
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Work Plan <br />Continued <br /> <br />E. Social, Economic, Land Use and Environmental Analysis <br /> <br />Economic and Development Implications <br /> <br />The same methodology and analysis being used for this task in the <br />Northstar Corridor MIS and Commuter Rail Feasibility Study will be <br />used for the extension study to St. Joseph of the Commuter Rail <br />alternative. Many times transportation investments in a corridor which <br />connect small towns, suburbs, and developing areas with a major city <br />accomplish more than merely moving people quicker and more <br />efficiently. <br /> <br />Environmental Screening Analysis <br /> <br />The same methodology and analysis being used for this task in the <br />Northstar Corridor MIS and Commuter Rail Feasibility Study will be <br />used for the extension study to St. Joseph. An environmental screening <br />analysis will be conducted of likely environmental and social effects of <br />the commuter rail alternative. <br /> <br />The screening analysis will be summarized in a technical memorandum <br />sufficient to include in a subsequent state or federal environmental <br />document. <br /> <br />F. Financial Analysis <br /> <br />The same methodology and analysis being used for this task in the <br />Northstar Corridor MIS and Commuter Rail Feasibility Study will be <br />used for the extension study to St. Joseph. The capital and operating <br />costs of the alternatives, as well as the expected revenues produced by <br />these alternatives will be determined in other elements of the study. <br /> <br />Task 3: Deliverables <br /> <br />The following deliverables will be produced. <br /> <br />. <br /> <br />Commuter Rail Alternative Report, including (Task 2): <br />- Capital Cost Estimate <br />- Typical Plan/Profile Drawings and Typical Cross-Sections <br />- Signal System Assessment <br />- Operating Plan <br />- Operating and Maintenance Cost Estimate <br />- Ridership Forecast Technical Report <br />- Revised Financial Analysis Technical Memorandum for the <br />extension study area <br /> <br />BRW, Inc. <br /> <br />Exhibit A-Revised Work Plan for the Extension of the <br />Northstar Corridor MIS west of St. Cloud <br /> <br />#25092 <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.