My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 02-21-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
02-21-2017
>
7.1. SR 02-21-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 12:06:43 PM
Creation date
2/16/2017 3:43:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
970 98099010001010102010301040 <br />96397098 <br />0 <br />9 <br />9 <br />0 <br />10 <br />0 <br />0 <br />10 <br />1 <br />0225th Ave NWUS 169 <br />Ba <br />l <br />d <br />w <br />i <br />n <br /> <br />S <br />t <br /> <br />N <br />W <br />Future Frontage Road (Concept)Livonia TownshipProposed Mining OperationCity of Elk RiverPermitted Mining OperationSHEET NO:DATE:DRAWN BY:CHECKED BY:SCALE:APPROVED BY:PROJECT NO.:REG. NO.:DATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISIONAND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA.DESCRIPTION:INFORMATION:REVISIONDATEEngineering, PLLC.CONSULTING CIVIL ENGINEERS10830 NESBITT AVENUE SOUTHBLOOMINGTON, MINNESOTA 55437(952) 881-3344 TELEPHONE(952) 881-1913 FAXwww.sundecivil.comSundeKirsten Pauly of2184212/20/2016ReclamationPlanC3Notes:1.Final grades at common mining borderswill be coordinated with adjacent landuse.2.Areas mined below the water table willbe backfilled as part of final reclamation.3.Reclamation grades at common miningborders may be adjusted based oncoordination with adjacent mineoperators.4.Reclamation slopes shall not exceed 3:1(H:V) unless otherwise approved by theCity.5.Reclaimed upland areas will be coveredwith a minimum of 3" of topsoil andseeded and mulched to establishvegetative cover.6.Baldwin St. NW may be lowered and /orrealigned in the future which will requirereclamation grades in affected area tobe modified.7.Final Grades to be coordinated withmine operations to the north and southof the Site.Max Steininger, Inc.Elk River Sand &Gravel Mine
The URL can be used to link to this page
Your browser does not support the video tag.