My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. SR 02-21-2017
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2011 - 2020
>
2017
>
02-21-2017
>
7.1. SR 02-21-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 12:06:43 PM
Creation date
2/16/2017 3:43:55 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/21/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
US 169Permitted Mining OperationProposed Mining OperationPhase 1Phase 2Phase 3Phase 4Permitted Mining OperationLivonia TownshipCity of Elk RiverScreening BermHaul RoadScreening BermScreening BermSite AccessBa <br />l <br />d <br />w <br />i <br />n <br /> <br />S <br />t <br /> <br />N <br />W225th Ave NWStockpileAreaTrees to remainas screening30' Setback30' Setbackfrom ROWCommon Mining BorderCommon Mining BorderDrivewayScreening BermSHEET NO:DATE:DRAWN BY:CHECKED BY:SCALE:APPROVED BY:PROJECT NO.:REG. NO.:DATE:I HEREBY CERTIFY THAT THIS PLAN,SPECIFICATION, OR REPORT WAS PREPAREDBY ME OR UNDER MY DIRECT SUPERVISIONAND THAT I AM A DULY LICENSEDPROFESSIONAL ENGINEER UNDER THE LAWSOF THE STATE OF MINNESOTA.DESCRIPTION:INFORMATION:REVISIONDATEEngineering, PLLC.CONSULTING CIVIL ENGINEERS10830 NESBITT AVENUE SOUTHBLOOMINGTON, MINNESOTA 55437(952) 881-3344 TELEPHONE(952) 881-1913 FAXwww.sundecivil.comSundeKirsten Pauly of2184212/20/2016C2Mine PlanNotes:1.Once the Site has been opened up and the minefloor has been established, stockpiles andprocessing areas to be recessed below grade.2.Stockpile Area is approximate in size andlocation. Stockpiles and mining equipment maymove with progression of the mine.3.Existing vegetation within the setback area thatprovides sufficient screening will be maintainedinstead of a perimeter berm.4.Phase limits are approximate and may beadjusted as needed to accommodate marketdemand and variations in the materialsencountered.5.Baldwin St. NW may be lowered and/or realignedin the future in cooperation with MnDOT, the Cityof Elk River, adjacent mine operators and landowners.6.Site Access is conceptual in nature and may bealtered as site conditions/city authorizationsdictate.7.It is expected that common mining borders withadjacent properties will be mined as part of eachindividual Phase.8.Reclamation will move easterly as each Phase iscompleted and additional land is stripped inpreparation for mining.9.Mining into the groundwater may occur in amanner that will accommodate blendingmaterials from another Phase that are above thegroundwater.10.Materials may be transferred and stockpiled onadjacent Permitted Mining Operations and viceversa.11.Existing residence to be removed prior to finalphase of mining.Max Steininger, Inc.Elk River Sand &Gravel Mine
The URL can be used to link to this page
Your browser does not support the video tag.