My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 PCSR 01-24-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2017
>
01-24-2017
>
5.3 PCSR 01-24-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 3:30:40 PM
Creation date
1/20/2017 3:28:41 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/24/2017
case
CU 17-02 ZC 17-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
capacities that require registration are brought to the Site, the operator will register the tanks and <br />comply with the applicable MPCA regulations. <br />6.9 Topsoil: <br />All topsoil will be retained on the Site until the completion of reclamation. Topsoil will be used to <br />create screening berms. The berms may subsequently be removed as part of the reclamation <br />process. <br />6.10 Slopes: <br />The active mine face is typically at a slope that ranges from 1:1 to 2:1 (H:V). Reclaimed slopes will be <br />backfilled to a maximum slope of 3:1 (H:V). <br />7.0 CERTIFICATION <br />hereby certify that this plan, specification of report <br />was prepared by me or under my direct supervision <br />and that I am a duly Registered Engineer and duly <br />Registered Geologist under the laws of the State of <br />Minnesota. <br />Kirsten Pauly, PE, PG <br />Reg. No. 21842 Date 12/19/2016 <br />Tiller Corporation Sunde Engineering, PLLC <br />Conditional Use Permit Application Page 1 10 <br />City of Elk River <br />
The URL can be used to link to this page
Your browser does not support the video tag.