My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.3 PCSR 01-24-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2011-2020
>
2017
>
01-24-2017
>
5.3 PCSR 01-24-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2017 3:30:40 PM
Creation date
1/20/2017 3:28:41 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
1/24/2017
case
CU 17-02 ZC 17-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1.1 Minnesota Noise Standards for Residential Land Uses <br />Daytime <br />Nighttime <br />Lso <br />Lio <br />Lso Llo <br />60 dBA <br />65 dBA <br />50 dBA 55 dBA <br />Tiller conducted sound level monitoring and predictions in 2007 for other facilities that they operate <br />in Elk River using similar processing equipment to demonstrate the ability to comply with the <br />nighttime noise standards. Tiller presented this information to the City and Tiller is allowed 24 hour <br />operations at these other facilities. Although sound levels vary with distance and topographic <br />changes, the study concluded that these facilities can operate in compliance with the noise standards <br />at residential receptors located at similar distances to those at this site. <br />Sound level mitigation will be adopted at the Site including screening berms with additional height <br />as needed adjacent to residential properties. Mining and processing will be recessed on the floor of <br />the active mining area to reduce sound levels. Perimeter berms will be constructed to attenuate <br />noise. Maintenance of operating equipment and use of standard noise control equipment such as <br />mufflers will reduce sound levels at the Site. <br />6.6 Dust: <br />Fugitive dust will be minimized by recessed operations, spray bars on processing equipment, dust <br />suppressants on internal haul roads, and the establishment of permanent vegetation on perimeter <br />berms and reclaimed areas. Fugitive dust will not exceed air pollution standards established by the <br />Minnesota Pollution Control Agency. Processing equipment is subject to a MPCA air emissions <br />general permit for non - metallic mineral mining which includes standards for fugitive dust emissions. <br />6.7 Hours of Operation: <br />The project is proposing 24 hour operations except Sundays and holidays. <br />6.8 Water Pollution: <br />The Site will be operated in compliance with all applicable Minnesota Pollution Control Agency <br />(MPCA) and Department of Natural Resources standards. The Site will operate under the General <br />Non - Metallic Mineral Mining National Pollutant Discharge Elimination System (NPDES) stormwater <br />permit and Site specific Stormwater Pollution Prevention Plan. There are no surface waters including <br />lakes, streams, wetlands, intermittent channels, and county /judicial ditches on the Site. The mining <br />operations will not discharge washwater or untreated stormwater from the Site. Washwater will be <br />treated onsite and recycled. Stormwater will be drained and handled internally. There will be no <br />direct or indirect physical effects or alterations to surface waterfeatures. <br />Typically, equipment will be fueled by a fuel service truck. The fuel service truck carries a spill <br />containment kit. If on -site fuel storage is needed, the fuel storage tank will be an above ground <br />double - walled tank and will meet all MPCA petroleum storage tank requirements. If tanks with <br />Tiller Corporation Sunde Engineering, PLLC <br />Conditional Use Permit Application Page 19 <br />City of Elk River <br />
The URL can be used to link to this page
Your browser does not support the video tag.