Laserfiche WebLink
<br />I <br />I <br /> <br />2005 Improvement Project <br />November 4, 2004 <br /> <br />I <br /> <br />· As with the 2003 Pavement Management Project, the City will look for the Elk River <br />Municipal Utilities to pay for their construction costs based on actual bids and pay <br />estimates plus 10 percent for preliminary and [mal design and bidding. The constmction <br />services such as inspection, staking, and administration will be billed directly to the Elk <br />River Municipal Utilities. <br /> <br />I <br />I <br />I <br /> <br />If any of the points listed above do not reflect your understanding of our conversation <br />regarding watermain improvements included in the 2005 Street Reconstruction Project, <br />please call me immediately. <br /> <br />Sincerely, <br /> <br />I <br /> <br />Terry J. Maurer, P.E. <br />City Engineer <br /> <br />I <br /> <br />cc: Lori Johnson, Finance Director <br /> <br />I <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />Document in Microsoft Internet Explorer <br /> <br />Howard R. Green Company <br /> <br />Page 2 <br />