My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 02-07-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
02/07/2005
>
6.3. SR 02-07-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:09 AM
Creation date
2/3/2005 3:00:48 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/7/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~oward R. Green Company <br /> <br />November 4, 2004 <br /> <br />File: 824180J-0030 <br /> <br />Mr. Bryan Adams <br />General Manager <br />Elk River Municipal Utilities <br />13069 Orono Parkway <br />Elk River, MN 55330 <br /> <br />RE: 2005 PAVEMENT REHABILITATION IMPROVEMENT <br />W ATERMAIN IMPROVEMENTS <br /> <br />Dear Mr. Adams: <br /> <br />Thank you for meeting with John Anderson and me to discuss the City's proposed 2005 <br />Pavement Rehabilitation Project. As you aware, the City is planning to reconstruct 5th Street, <br />Tipton Avenue, and Upland Avenue. As we discussed the proposed street improvement <br />relative to your watermain system, you requested that the following watermain <br />improvements be added to the project: <br /> <br />· On Rush Avenue from 5th Street to Trunk Highway 10 and under Trunk Highway 10, <br />you have requested an 8-inch watermain be installed, connecting to the existing <br />watermain on the north side of Trunk Highway 10. <br />· On 5th Street from Rush Avenue to the west, you have requested a 12-inch watermain be <br />installed, connecting to the existing lO-inch HDPE pipe in place at the end of 5th Street. <br />· You have requested a bid alternate be included in the project for a 12-inch watermain <br />under Trunk Highway 10 at the east end of the 5th Street project. <br />· You requested that all old-style hydrants be replaced with new Waterous hydrants. <br />· The Elk River Municipal Utilities will have your personnel survey the properties along <br />the 2005 Pavement Rehabilitation Project to determine if any of the existing water <br />services are of a lead material. Based on the results of that survey, direction will be given <br />to us relative to any water services to be replaced. <br />· We will pull together all pertinent information from the 2003 project relative to <br />temporary water services in areas of watermain replacement and for connection of <br />copper service pipe to differing materials for your review, prior to final preparation of <br />project plans and specifications. <br />· As project plans are prepared, we will review the 90 percent completed plans and <br />specifications with you and your staff and will present a probable estimate of cost. <br /> <br />2550 University Avenue West. Suite 400N · St. Paul, MN 55114 . 651/644-4389 fax 651/644-9446 toll free 888/368-4389 <br />
The URL can be used to link to this page
Your browser does not support the video tag.