My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 02-07-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
02/07/2005
>
6.3. SR 02-07-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:09 AM
Creation date
2/3/2005 3:00:48 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/7/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br /> <br />City of Elk River <br />Project BN-04-06875 <br />December 8, 2004 <br />Page 8 <br /> <br />I <br /> <br />!- <br /> <br />I <br /> <br />F. General Recommendations <br /> <br />I <br /> <br />F.1. Basis of Recommendations <br />The analyses and recommendations submitted in this report are based upon the data obtained <br />from the soil borings performed at the locations indicated on the attached sketch. Often, <br />variations occur between these borings, the nature 'and extent of which do not become evident <br />until additional exploration or construction is conducted. A re-evaluation of the <br />recommendations in this report should be made after performing on-site observations during <br />construction to note the characteristics of any variations. The variations may result in additional <br />foundation costs, and it is suggested that a contingency be provided for this purpose. <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />It is recommended that we be retained to perform the observation and testing program for the <br />sub grade preparation phase of this project. This will allow correlation of the soil conditions <br />encountered during construction to the soil borings, and will provide continuity of professional <br />responsibility. <br /> <br />I <br /> <br />I <br /> <br />F.2. R~view of Design <br />This report is based on the design of the proposed roadways as related to us for preparation of <br />this report. It is recommended that we be retained to review the geotechnical aspects of the <br />designs and specifications. With the review, we will evaluate whether any changes in design <br />have affected the validity of the recommendations, and whether our recommendations have been <br />correctly mterpreted and implemented in the design and specifications. <br /> <br />I <br /> <br />I <br /> <br />F.3. Groundwater Fluctuations <br />We made water level observations in the borings at the times and under the conditions stated on <br />the boring logs. These data were interpreted in the text of this report. The period of observation <br />was relatively short, and fluctuation in the groundwater levei may occur due to rainfall, flooding, <br />irrigation, spring thaw, drainage, and other seasonal and annual factors not evident at the time the <br />observations were made. Design drawings and specifications and construction planning should <br />recognize the possibility of fluctuations. <br /> <br />I <br />I <br /> <br />1 <br /> <br />I <br /> <br />.1 <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.