My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.3. SR 02-07-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
02/07/2005
>
6.3. SR 02-07-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:34:09 AM
Creation date
2/3/2005 3:00:48 PM
Metadata
Fields
Template:
City Government
type
SR
date
2/7/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Appendix D describes the informational hearing in more detail including minutes and a <br />signup sheet. <br /> <br />IX. ESTIMATED PROJECT COST <br /> <br />The estimated construction costs and associated overhead costs for the proposed <br />improvements are summarized in Table 1. Based on past experiences on similar <br />complex-type projects in the City, the overhead costs have been estimated at 28% of the <br />total construction cost. The overhead costs include city administration, engineering <br />design, construction staking and inspection, and fiscal and legal costs. <br /> <br />Table 1 <br /> <br />Project Cost Estimate <br /> <br />Street/Drainage <br /> <br />$1,190,650 <br />$137,410 <br />$115.860 <br />$1,443,920 <br />$404,300 <br />$ 144.390 <br />$1,992,610 <br /> <br />Sanitary Sewer <br /> <br />Watermain <br /> <br />Total Construction Cost <br /> <br />Administration, Engineering, Fiscal, & Legal <br /> <br />Contingency (10%) <br /> <br />Total Project Cost <br /> <br />X. FINANCING AND ASSESSMENTS <br /> <br />The improvements discussed in this report are proposed to be financed through a <br />number of different methods. Benefiting properties would be assessed on a per unit <br />basis for street, curb and gutter, sidewalks, and storm sewer. A residential lot that could <br />not be further subdivided would be assessed as one unit. Lots that can be subdivided <br />would be assessed as multiple units as appropriate. Churches and other non-residential <br />property would be assessed as multiple units determined by the lot area. The number of <br />assessable units is approximately 75, as shown on Exhibit 8. In accordance with the <br />adopted Pavement Rehabilitation Report, the proposed assessment is $6,000.00 per <br />unit. The total assessment amount would then be $450,000. <br /> <br />The Elk River Municipal Utilities and City Sewer Department would be responsible for <br />funding all sanitary sewer and water improvements, including construction cost plus <br />associated overhead. Based on the estimated total project funding from the utility <br />enterprise fund is $253,000. <br /> <br />Based on the estimated total project cost of $1,992,610, total assessments of $450,000 <br />and Elk River Municipal Utilities contribution of $253,000, the remaining project cost to <br />be funding by the City is $1,289,610. Discussion is currently under way with MN/DOT, <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.