<br />The O&M cost model was run for the Northstar Commuter Rail Concept B system plan <br />and the overall results are shown below. All costs are in FY 1999 dollars. The annual <br />total and line item detail O&M costs are shown in Table 1. Included in the table are <br />indications of cost-effectiveness (e.g., cost per train-hour). <br /> <br />. <br /> <br />Commuter Rail Annual Operatinl! and Maintenance Costs (in FY 1999 Dollars) <br /> <br />. Train Operations and Maintenance <br />. Track Maintenance and Use <br />.. Operating Agency <br />(Station Maintenance, Diesel Fuel, Insurance, Staff, etc.) <br /> <br />$3,854,000 <br />1,818,000 <br />3,855,000 <br /> <br />Total for Commuter Rail <br /> <br />$9.527.000 <br /> <br />Feeder Bus Operations and Maintenance <br /> <br />The feeder bus network that was developed to provide service to the Northstar Commuter <br />Rail system is detailed in Table 2. The bus operations plans reduce Metro Transit bus <br />service frequencies on existing express routes that duplicate the commuter rail service. <br />Existing bus route alignments are modified to connect to commuter rail stations, and <br />service frequencies are modified on some routes to provide strong bus connections to the <br />commuter rail service. <br /> <br />Table 2 summarizes the Concept B feeder bus plan and annual O&M costs. Metro <br />Transit's operation in the corridor would decrease by four peak buses and $36,000 in <br />annual operating costs. Anoka County's operations would increase by six peak buses and . <br />$297,000 in annual operating costs. The River Rider operations would increase by five <br />peak buses and $225,000 in annual operating costs. The Tri-Cap operations would <br />increase by 2 peak buses and by $90,000 in annual operating costs. St. Cloud MTC's <br />operational changes would be made without increasing the existing budget. <br /> <br />The proposed plan would operate approximately 19,000 net annual bus-hours at a net <br />annual O&M cost of $576,000 in the Northstar Corridor, including the reductions in <br />service that would be realized by the Metro Transit. However, it is assumed that Metro <br />Transit's service reduction of 4 peak buses would not be available to the other Northstar <br />Corridor transit operators. Therefore, a total of 13 peak buses would be required in the <br />corridor for Concept B. <br /> <br />Feeder Bus Annual Operatinl! and Maintenance Costs (in FY 1999 Dollars) <br /> <br />. Metro Transit <br />. Anoka County <br />. River Rider <br />. Tri-Cap <br /> <br />($36,000) <br />$297,000 <br />225,000 <br />90,000 <br /> <br />Total for Feeder Bus <br /> <br />$651.000 <br /> <br />The feeder bus component of the Northstar Corridor Rail System is part of the overall <br />transit plan for the corridor and will be addressed in the financial analysis. <br /> <br />. <br /> <br />Draft Commuter Rail Technical Feasibility Study <br />December 1998 <br /> <br />6-2 <br />Operations and Maintenance <br />